BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Aurora, Colorado. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of December 20, 2022, this project has not yet been awarded. A timeline for award has not yet been established. The Nine Mile Pedestrian Bicycle Bridge Over SH-83 is a partnered Colorado Department of Transportation (CDOT) project that will consist of the following work to be performed: Construction of a new covered and enclosed pedestrian bridge spanning S. Parker Road (SH-83) Construction of bridge landings, including elevator towers with mechanical, maintenance, electrical rooms, and stairs and elevators at each end of the bridge Installation of four elevators Installation of temporary and permanent concrete flatwork and landscaping for access to and around the landings and bridge Resetting of a CDOT owned overhead sign structure in the median of S. Parker Road Modifications to existing wayfinding signage Anticipated Construction Period: December 2022 to January 2024. Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Bid Deposit Required - Insurance Required - Prevailing Wage Required Question Acceptance Deadline 10/21/2022 05:00 PM EDT Questions are submitted online No To ensure bidders have a clear understanding of the specifications and scope of work requirements, an Optional Pre-Bid Conference is scheduled. Attendance is not required, but highly encouraged. This will be an online event using Microsoft Teams. Interested parties may join the meeting by using the following event link: Each bid response shall be submitted on the prescribed forms supplied in the Project Manual. Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond made payable to the City of Aurora in an amount of not less than five percent (5%) of the amount of the Bid. Original bid bonds do not have to be mailed; however, each bidder should maintain the original on file should the City request it at a later time. Join by phone +1-408-418-9388 United States Toll

Bid Results

Bridges / Tunnels

$17,632,549.00

Public - City

Paving, Site Work

215

41

6

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
70
Bidding Soon
974
All Active Projects
419
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2022

January 17, 2023

img_map_placeholder

CO-83, Aurora, CO


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.