BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Montreal, Quebec. Conceptual plans call for site work for a playground / park / athletic field; road / highway; water / sewer project; for paving for a road / highway; and bridge / tunnel.

Development of a new park in the Quartier des Spectacles. The scope of the project includes the development of the lot 066 with a total area of 9,520 m2, located between De Maisonneuve Boulevard, De Bleury Street, Du Président Kennedy Avenue and Jeanne-Mance Street and surrounding areas. This sector, previously used as a municipal parking lot, has recently undergone a significant real estate development including municipal and private buildings. The project includes the development of the unoccupied lot areas to develop green spaces, park and vegetation areas. The chosen concept proposes a pedestrian walkway, which will have an educational, inclusive and participatory character, and which will overlook an urban forest with a dense plantation of indigenous species, based on the Miyawaki method. Bioretention basins will capture runoff water, with the objective of ecological transition. Bleachers will allow a variety of uses as well as an alternative route to that of the footbridge. TIMELINE: The project planning has been stopped at the conceptual stage due to the construction in the concerned area of a new Museum of Contemporary Art (MAC) project. The MAC construction projet is experiencing significant delays and is expected to be completed in 2026. According to the currently available information the construction of the Le Jardin d'Emiliano project may not begin before 2027, after the completion of the MAC project. Project will be followed when its design resume. Coverage of this report has been discontinued. Note. The new Museum of Contemporary Art (MAC) project is followed in the report under CRM ID name Musée d'Art Contemporain of Montreal (MAC) Addition and Renovation.

Project Abandoned

Playgrounds / Parks / Athletic Fields

$8,500,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
230
Active Projects
105
Bidding Soon
1,725
All Active Projects
698
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

img_map_placeholder

Boulevard de Maisonneuve O & Rue de Bleury, Montreal, QC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.