Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published February 19, 2021 at 7:00 PM
Updated May 28, 2024
Site work for a water / sewer project in Forest Grove, Oregon. Completed plans call for site work for a water / sewer project.
The work generally consists of providing all construction services, equipment, necessary tools, materials, fuel, personnel, supervision, and labor required to complete the preparation and placement as specified herein: o Install 500 Linear Feet of Sanitary sewer main including 1 new manhole, 1 connection to existing manhole, laterals, and future tees. Restoration of construction area Engineers Estimate: $115,000 to $130,000 City intends to have the work fully completed by June 30, 2021 Bids must contain: A bid bond on the City's Bid Guaranty form, irrevocable letter of credit issued by an insured institution as defined in ORS 706.008, certified check, or cashier's check, of at least ten percent (10%) of the total bid. The City reserves the right, but is not obligated, to waive any irregularities or informalities in its sole and absolute discretion. Form of Proposal: All vendors must accept the terms included with this Request for Proposals as part of the contract. If a proposer is exempt from a particular term due to a statutory or regulatory exception or exemption, whether the exception or exemption applies to the contract matter, the type of work, or the vendor, the vendor will be considered to have met the requirements of that term. The City reserves the right to negotiate a final contract that is in the best interest of the City. The work generally consists of providing all construction services, equipment, necessary tools, materials, fuel, personnel, supervision, and labor required to complete the preparation and placement as specified herein: Install 500 Linear Feet of Sanitary sewer main including 1 new manhole, 1 connection to existing manhole, laterals, and future tees. Restoration of construction area. Engineers Estimate: $115,000 to $130,000. City intends to have the work fully completed by June 30, 2021.
Bid Results
Water / Sewer
$100,056.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 5, 2020
December 7, 2020
10th Ave, Forest Grove, OR
Related To This Project
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed