BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a municipal facility in El Paso, Texas. Completed plans call for the construction of a 4,456-square-foot municipal facility; and for site work for a municipal facility.

The work under this contract shall be for furnishing all labor, materials, transportation, and services for the construction and installation of the following work: The Wastewater Field Office will be a 4,456sf building which provides offices and workstations, as well as locker rooms, a conference and breakroom for maintenance staff at the plant. The project requires construction of a one-story, metal framed building, with two (2) roof types and both stucco and brick veneer cladding. The project will also provide as accessible parking area, walkways, a pond area, and landscaping at the northwest corner. Coordination of construction activity with the plant's daily operations will be critical to the project's successful completion. Personnel for the project will be a customary A/E project and construction management, to include and RPR, as well as a contractor's team to include a superintendent, foreman and all building and site improvement trades. Timeline Summary (after contract approval): NTP: May 6, 2022 Substantial Completion @ 240 calendar days, or January 4, 2023 Final Completion @ 270 Calendar days, or February 3, 2023 The project description, as shown above, is only a general overview of this project. The Contractor shall refer to the project plans and specifications for further information. Any failure of the Contractor to complete the project within the contract period, will be considered a material breach of this contract. Key personnel specifically required for the for the Project includes the Project Manager, Project Superintendent, Project Scheduler, Quality Assurance Supervisor, and Foreman.

Post-Bid

Municipal

$1,300,000.00

Public - City

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
7
Bidding Soon
248
All Active Projects
110
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2022

May 23, 2022

img_map_placeholder

4100 Delta Dr, El Paso, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.