BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Demolition, site work, renovation and addition to a detention facility in Belton, Texas. Completed plans call for the addition of a detention facility; for the demolition of a detention facility; for the renovation of a detention facility; and for site work for a detention facility.

http://cms6.revize.com/revize/beltontx/Agendas%20&%20Minutes/P&Z%20Commission/2021/09%20-%20September%2021,%202021.pdf Z-21-14 Hold a public hearing and consider an amendment to an existing Planned Development Commercial Highway Zoning District to revise the master site plan to incorporate new and future facilities at the Bell County Justice Center, at 2405 S. Loop 121, located east of South Loop 121 and south on Huey Drive, comprising of approximately 75 acres __________________________________________________ Construction Manager-At-Risk Services from qualified firms to manage the construction of the project described below. The successful CMR firm will contract directly with the County and will work cooperatively with the County and the Design Professionals to successfully complete the full scope of the Project within the project budget and on schedule. This project consists of selective demolition, renovation and new construction, as well as site utilities, paved parking and access drives to accommodate the proposed expansion to the existing Bell County Loop Jail, in Belton, Texas. Demolition and renovation of existing interior spaces total approximately 19,000 square feet, and new construction consists of 188,000 square feet, totaling approximately 207,000 square feet of constructed space. The successful Construction Manager at Risk (CMR) will assist the design team in confirming the overall scope and costs of construction along with the required demolition and any related environmental remediation required. Construction Budget: $90,000,000.00 - 100,000,000.00 last day for questions is May 25th at 2:00 p.m.

Award

Jails / Prisons

$95,141,000.00

Public - County

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
40
Bidding Soon
1,698
All Active Projects
562
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2021

July 20, 2021

img_map_placeholder

2405 S Loop 121, Belton, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.