Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, renovation and addition to a detention facility in Belton, Texas. Completed plans call for the addition of a detention facility; for the demolition of a detention facility; for the renovation of a detention facility; and for site work for a detention facility.
http://cms6.revize.com/revize/beltontx/Agendas%20&%20Minutes/P&Z%20Commission/2021/09%20-%20September%2021,%202021.pdf Z-21-14 Hold a public hearing and consider an amendment to an existing Planned Development Commercial Highway Zoning District to revise the master site plan to incorporate new and future facilities at the Bell County Justice Center, at 2405 S. Loop 121, located east of South Loop 121 and south on Huey Drive, comprising of approximately 75 acres __________________________________________________ Construction Manager-At-Risk Services from qualified firms to manage the construction of the project described below. The successful CMR firm will contract directly with the County and will work cooperatively with the County and the Design Professionals to successfully complete the full scope of the Project within the project budget and on schedule. This project consists of selective demolition, renovation and new construction, as well as site utilities, paved parking and access drives to accommodate the proposed expansion to the existing Bell County Loop Jail, in Belton, Texas. Demolition and renovation of existing interior spaces total approximately 19,000 square feet, and new construction consists of 188,000 square feet, totaling approximately 207,000 square feet of constructed space. The successful Construction Manager at Risk (CMR) will assist the design team in confirming the overall scope and costs of construction along with the required demolition and any related environmental remediation required. Construction Budget: $90,000,000.00 - 100,000,000.00 last day for questions is May 25th at 2:00 p.m.
Award
Jails / Prisons
$95,141,000.00
Public - County
Addition, Demolition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 8, 2021
July 20, 2021
2405 S Loop 121, Belton, TX
Related To This Project
Belton, TX
Bid Date: Jul 08 2020
Belton, TX
--
Belton, TX
Bid Date: Nov 28 2018
Belton, TX
Bid Date: Feb 03 2021
Belton, TX
--
Belton, TX
Bid Date: Oct 03 2019
Belton, TX
Bid Date: Mar 01 2022
Belton, TX
Bid Date: Aug 03 2022
Belton, TX
Bid Date: Jan 08 2019
Belton, TX
--
Belton, TX
Bid Date: Aug 30 2022
Belton, TX
Bid Date: Aug 16 2022
Belton, TX
Bid Date: Jun 30 2022
Belton, TX
Bid Date: Jun 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.