BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Pueblo, Colorado. Completed plans call for site work for a road / highway; water / sewer project; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

In general, this project will consist of the removal and replacement of an existing stormwater pump station near the intersection of 29th Street and I-25, Pueblo, Colorado. Key features of the project include: demolition of the existing stormwater pump station and appurtenances; construction of a new reinforced concrete stormwater pump station with wet well, dry well, installation of two 60 hp pumps (to be supplied by the City), one 25 hp pump (to be supplied by the City), 10" -30" DIP piping, fittings and valves; 30" flow meter and vault; air and vacuum relief valve and manhole; prefabricated fiberglass building for electrical and pump controls; SCADA system; storm drainage inlet, manhole and pipe improvements; gravel access drives; removal and replacement of existing asphalt, curb, gutter, and sidewalk as detailed in the plans and specifications for this project. Question Acceptance Deadline 11/16/2020 12:00 PM EST Questions are submitted online No Solicitation:-SC03287-125R1, 20001

Under Construction

Roads / Highways

$2,649,095.00

Public - City

Paving, Site Work

43

18

26

3

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
8
Bidding Soon
220
All Active Projects
91
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2020

January 25, 2021

img_map_placeholder

E 29th St, Pueblo, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.