Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 14, 2020 at 7:00 PM
Updated October 24, 2023
Site work, paving and new construction of a bridge / tunnel in Southington, Connecticut. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
**As of December 14, 2020, the project has not been awarded. A timeline for the award is not yet determined.** Federal Project F.a.p. # 6131(009) Town of Southington State Project No. 131-206 Spring Street Bridge Over Quinnipiac River Contract Goal: 11% Disadvantaged Business Enterprises (Dbes) The Town of Southington (Municipality) Hereby Notifies All Bidders That It Will Affirmatively Ensure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and That They Will Not Be Discriminated Against on the Grounds of Race, Color, National Origin, Sex, Sexual Orientation, Mental Retardation or Physical Disability, Including but Not Limited to Blindness, in Consideration for an Award. Letter Signed by the Ctdot Contracts Manager Shall Be Included as Part of the Bid Package Submitted to the Municipality. Note: Any Contractor or Subcontractor Engaged in Surface Preparation and/or Coating Ap Plication Must Be Certified by the Steel Structures Painting Council. Note: a Surety Company Bond, on the Form Furnished by the Municipality, for at Least 30 Percent of the Amount of the Bid Must Accompany Each Proposal. A Certified Check Will Not Be Accepted. The Municipality Reserves the Right to Reject Any and All Bids. Note: the Two (2) Lowest Bidders, as Determined by the Municipalityimmediately After the Bid Opening, Shall Submit the Pre-award Dbe Commitment Approval Request Form(S) to the Municipality No Later Than Five (5) Calendar Days After the Bid Opening. This is a Requirement of Title 49, Code of Federal Regulations (Cfr) Part 26, Participation of Dbes. If the Second Low Bidder Does Not Submit the Re Quired Dbe Forms Within the Required Time, They Will Not Be Eligible for Contract Award.
Bid Results
Bridges / Tunnels
$1,852,164.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2020
April 1, 2021
Spring St, Southington, CT
Related To This Project
Southington, CT
--
Southington, CT
--
Southington, CT
--
Southington, CT
Bid Date: Apr 27 2023
Southington, CT
--
Southington, CT
--
Southington, CT
Bid Date: Jun 13 2023
Southington, CT
--
Southington, CT
Bid Date: Nov 12 2021
Southington, CT
--
Southington, CT
Bid Date: Apr 22 2021
Southington, CT
Bid Date: Apr 04 2023
Southington, CT
Bid Date: Nov 12 2021
Southington, CT
Bid Date: Mar 19 2021
Southington, CT
Bid Date: Apr 04 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
