BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 27, 2022 at 7:00 PM

Updated January 25, 2024

Site work and paving for a mixed-use development in Saint Augusta, Minnesota. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

MnDOT will be the lead agency in reconstructing the interchange at TH 10 and TH 23. The project includes the following key elements: - Reconstruction of the TH 10 and TH 23 Interchange - Reconstruction of TH 10 from 15th Avenue SE to the former rail crossing north of East St. Germain Street - Reconstruction of TH 23 from Lincoln Avenue to Mayhew Lake Road - Grade separation of 4th Street SE with TH 10 under a bridge with road and sidewalk. MnDOT requests proposals for the final design of SP 0503-91 (TH 23/TH 10) in St. Cloud. The project includes reconstruction of the TH 23/TH 10 interchange, highway reconstruction, retaining walls, sidewalks, trails, ADA improvements, new traffic signals and traffic signal replacements, lighting, signing and striping. Coordination with MnDOT's Bridge Design Unit is required. The method of contractor selection has not been determined at this time. MNDOT - RFP Engineering - TH 23/TH 10 Interchange and Highway Reconstruction Final Design

Design

Roads / Highways

$40,162,383.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
124
Bidding Soon
1,429
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2023

Project location map

MN-23, Saint Augusta, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.