Published November 24, 2020 at 7:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Lake Forest Park, Washington. Completed plans call for the renovation of a municipal facility.

The project consists of the following work.: The project includes improvements to the District's Lake Forest Park Reservoir and Booster Pump Station. The improvements at the Lake Forest Park Reservoir include demolition and replacement of existing site fencing, installation of new double swing access gate, installation of new access man gate, waterproofing guardrail and posts along the parapet wall, installation of new vehicular wheel stops, installation of a new roof access hatch, modification of existing reservoir access hatch into a roof vent hatches, and associated site restoration. The improvements to the booster pump station include installation of new electrical vault, demolition, removal and waste haul of an existing generator and associated appurtenances, installation of new remote fuel fill station and alarm panel, installation of new generator and associated appurtenances, modifications to existing booster station door thresholds and installation of window glazing, and painting of interior and exterior of the station, including floors. Electrical improvements to the booster pump station include modification of existing utility service conduit routing, installation of new utility service meter base, installation of new automatic transfer switch, installation of new manual transfer switch and associated electrical, installation of a load bank connection, installation of new power quality panel, installation of new motor starters and installation of new 7 power distribution panel. The contractor will be required to work with the District's control systems integrator, Quality Controls Corporation as subcontractors for the project. Approximate locations of the proposed improvements are shown on the project construction plans. Each bid must be submitted on the "Proposal" forms provided, in Section 5 of the "Specifications, Proposal and Contract Documents" and shall be accompanied by a bi proposal deposit, in the form of a surety bond, postal money order, cashier's check or certified check made payable to King County Treasurer, King County, Washington for a sum of not less than 5 per cent of the total bid. A bid shall not be considered unless accompanied by such bid proposal deposit. CONTRACT AWARD A contract, if awarded, will be based upon the lowest responsive and responsible bid or bids as defined in more detail in the bid documents. Northshore Utility District reserves the right to reject any and all bids, to delete portions or all of the work, to substitute alternative bid item prices for base bid item prices, to waive any informality in bidding, and to make the award deemed to be in the best interest of the District. Proposals received after the time announced for the opening will not be considered . No bidder may withdraw its bid after the time announced for the opening or before the award and execution ofthe contract(R) unless the award is delayed for a period exceeding sixty (60) calendar days.

Award

Municipal

$631,725.00

Public - State/Provincial

Renovation

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, References, Definitions, Quality Assurance, Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Fire-Suppression Water Storage, Storage Tanks for Fire-Suppression Water
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Facility Potable-Water Storage Tanks, Facility Sanitary Sewerage, Sanitary Sewerage Pumps, Facility Storm Drainage, Sump Pumps, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems, Swimming Pool Pumps, Fountain Plumbing Systems, Fountain Pumps, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Gas Storage Tanks for Laboratory and Healthcare Facilities
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Facility Fuel Systems, Facility Fuel-Storage Tanks, HVAC Air Distribution, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Fuel Distribution Utilities, Fuel-Storage Tanks, Aviation Fuel-Storage Tanks, Compressed Gases Storage Tanks, Electrical Utilities, Utility Substations
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
69
Bidding Soon
1,068
All Active Projects
471
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2020

December 10, 2020

img_map_placeholder

Multiple Locations, Lake Forest Park, WA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Lake Forest Park Reservoir and Booster Station Upgrades

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.