Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, renovation and addition to an educational facility in Dallas, Texas. Completed plans call for the addition of a educational facility; and for the demolition of a educational facility.
**As of 1/27/2021 project was not yet been awarded. Recommendation for award are scheduled for formal approval on February 25th. Solicitation no- D20-2079.00 No further information will be publicly released until after the date the Agenda is publicized for the Board of Trustees briefing. The right is reserved to reject any or all bids, proposals, CSPs or statements of qualification and to waive technicalities. The Dallas Independent School District is committed to the ideals of equal opportunity in all its business endeavors. The Dallas Independent School Districts Construction Services projects have a 30% Minority and Women-Owned Business Enterprise (M/WBE) construction goal. ORG 209 - Ascher Silberstein Elementary School - Project consists of the following; 1. Abatement of environmental hazardous materials to be included in contract, per direction of District Environmental Consultant. 2. Removal and replacement of a portion of the south parking lot, restriping, and erosion repair along the edge of the creek. 3. Removal of failed retaining wall along creek, erosion correction, and installation of new retainingwall. 4. Removal of a portion of the existing chain link fence next to the creek up to the front entry of the school and replacement with new wrought iron fence. 5. Install new DISD Marquee Sign, with power and data connecting to the school building, between south parking and creek. 6. Renovation of existing entry canopy, inclusive of structural changes, new finishes, and new lighting. Removal of existing site bollards by entry and installation of new lighted bollards. 7. Installation of new secured entry vestibule, with new interior finishes, new interior storefront, new chandelier. 8. Renovation of Reception area with all new finishes, new reception desk, new seating. 9. Removal of existing kitchen and selected demolition as needed of the existing cafeteria and surrounding site work new Addition to expand and renovate Cafeteria with all new finishes, all new kitchen inside existing building, new accessible route, and site work. Relocation of existing storage units. 10. Removal of steps and raised concrete in the north parking lot, small amount of new paving work, and restriping of north parking lot. 11. Two new Additions on the West end of the school, for new Mechanical Rooms. Replace Fire Alarm System in school . Lighting: Replace all interior and exterior lights with LED, install all new Lighting Controls. All exterior doors in the old wing of the school to be replaced with all new hardware Replace exhaust fans, replace chilled water piping, provide new DDC Controls, replace VAV units, replace rooftop DX units, replace heating water piping, replace lined ductwork, replace unit ventilators, new VFDs on pumps, replace chilled water pumps, replace air-cooled chiller, replace domestic cold water piping, replace hose bibbs, replace all natural gas piping. Solicitation number -D20-2079.00 Estimated Project Budget: $11,363,293.20
Award
Educational
$9,089,448.00
Public - City
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2020
January 18, 2021
5940 Hollis Ave, Dallas, TX
Related To This Project
Dallas, TX
Bid Date: Oct 23 2020
Dallas, TX
Bid Date: Sep 29 2020
Dallas, TX
Bid Date: Jul 28 2020
Dallas, TX
Bid Date: Aug 04 2020
Bond 36-Month Street Resurfacing and Street Improvements for the 2017 Capital Bond Program - 3735073
Dallas, TX
Bid Date: Jun 28 2019
Dallas, TX
Bid Date: Sep 08 2020
Dallas, TX
Bid Date: Jun 21 2019
Dallas, TX
Bid Date: Aug 21 2020
Dallas, TX
Bid Date: Jul 19 2021
Dallas, TX
Bid Date: Jul 13 2021
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Nov 14 2024
Dallas, TX
Bid Date: Nov 12 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.