BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 4, 2021 at 7:00 PM

Updated July 1, 2025

Renovation of a water / sewer project in Wellington, Ohio. Completed plans call for the renovation of a water / sewer project.

Contract A - Installation of a glass lined steel 303,000 gallon ground storage tank, 53' in diameter with a 19' side water depth Contract B - Reservoir Pumping Improvements Contract C - Ground Level Storage Tank and Reservoir Pumping Site Improvements The bid guaranty may be of two forms: 1. A Bid Guaranty and Contract Bond using the form in the Contract Documents. (The amount of the bid does NOT have to appear on this form.) 2. A certified check, cashier's check or letter of credit in favor of the Village of Wellington, Ohio in the amount of 10% of the bid. If the contract is awarded, a Contract Bond will be required, which is a 100% payment and performance bond. This procurement is subject to the EPA policy of encouraging the participation of small businesses in rural areas (SBRAs). After the award of the contract let by competitive bid and prior to the time the contract is entered into, bidders shall submit the affidavit required under the Ohio Revised Code, Section 5719.042 that the bidder was not charged with any delinquent personal property taxes in Lorain County, Ohio The successful bidder will be required to pay not less than the highest applicable minimum wage rates as established by the federal Davis-Bacon Wage Determinations issued by the U.S. Department of Labor. The Village of Wellington, Ohio reserves the right to reject any and all bids and to waive any irregularity in any bid and to determine the lowest and best bidder. The use of domestic steel and Made In USA products will be required for all aspects/components of this project This project is being partially funded with Ohio Public Works Commission (OPWC) and Ohio EPA Water Supply Revolving Loan Account (WSRLA) with Buy American requirements. No bidder may withdraw his bid for a period of 90 days after the scheduled closing time for the receipt of bids. By Order of Steve Dupee, Village Manager C.T The opinion of probable cost of construction for Contract A is $570,940. Contract A Mid Atlantic Storage Systems:-$650214 Contract B North Bay Construction:-$506,837 Contract C Iseler Demolition:-$32600

Award

Water / Sewer

$1,189,651.00

Public - City

Renovation

32

2

21

8

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
139
Bidding Soon
2,361
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2020

February 10, 2021

Project location map

To Be Determined, Wellington, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.