BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 18, 2021 at 7:00 PM

Updated April 9, 2025

Renovation of a mixed-use development in Troy, Illinois. Completed plans call for the renovation of a educational facility.

Triad Community Unit School District #2 (hereinafter referred to as District) located at 203 East Throp Street, Troy, Illinois, 62294, is seeking specific proposals from Qualified Energy Services Companies (ESCOs) which are capable of providing comprehensive infrastructure and energy-related capital improvement services. District is interested in contracting for a full range of energy and energy-related capital improvements at Triad Community Unit School District #2 (hereinafter referred to as project). These services and improvements are to be delivered on a performance contracting basis with guaranteed savings. The District is specifically seeking an expansion of existing solar systems at C.A. Henning Elementary and St. Jacob Elementary, and is further interested in other energy and energy-related capital improvements within the District (including, without limitation, at the High School and Marine Elementary). The District objective in issuing this Request for Proposals is to provide a competitive means in which to select a single provider to fulfill all aspects of alternative electric power services. The Board of Education may elect to implement further improvement measures in phases pursuant to the final contract. The work to be included in the contract may include upgrades to or replacement of equipment included in, but would not be limited to, the following systems: roofing, building envelope and infrastructure, windows, doors, insulation, weather stripping, caulking, security, flooring and sidewalks, electrical, lighting, heating, air conditioning, building automation, temperature control, facility management, bathroom renovations including domestic water and sewer, fire alarm, energy recovery systems, or other energy conservation measures that provide long term operating cost reductions. District reserves the right to reject any or all submissions and to waive informalities and minor irregularities in submissions received and to be the sole judge of the value and merit of the proposals offered. Questions or clarification may be directed to Mr. Mike Raymond via phone 618-667-8851 or email mike.raymond@tcusd2.org Any contact of the Board members during the RFP process and consideration of responding firms without approval of Ms. Leigh Lewis, Superintendent, will be grounds for immediate disqualification of the firm.

Award

Educational

$1,138,677.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
98
Bidding Soon
1,374
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2020

February 1, 2021

Project location map

Multiple Locations, Troy, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.