BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Anderson, South Carolina. Completed plans call for site work for a water / sewer project.

The Project consists of constructing approximately 3,900 linear feet of 27-inch gravity sewer, 4,900 linearfeet of30-inch gravity sewer, 400 linear feet of 42-inch gravity sewer, 48 manholes, connection to the existing system, erosion control, restoration,and grassing, testing and all other related appurtenances. A. Project Identification: Project consists of the following: 1. Byrum Creek Sewer Interceptor Improvements: a. Installation of approximately 3,900-linear feet of new 27-inch PVC gravity sewer. b. Installation of 20 sanitary sewer manholes. c. Three (3) road crossings. d. Connection to existing collection system at 10 locations. 2. Whitner Creek Sewer Interceptor Improvements: a. Installation of approximately 4,500 linear feet of new 30-inch PVC gravity sewer and 400 linear feet of new 30-inch DIP gravity sewer. b. Installation of 26 sanitary sewer manholes. c. Two (2) road crossings. d. Three (3) creek crossings. e. Connection to existing collection system at 10 lcoations. 3. Generostee Creek Sewer Trunk Improvements: a. Installation of approximately 400 linear feet of new 42-inch DIP gravity sewer. b. Installation of two (2) sanitary sewer manholes. B. Project Location: Anderson, South Carolina C. Owner: City of Anderson 401 South Main Street Anderson, South Carolina 29624 Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form. Bid security shall be furnished in accordance with the Instructions to Bidders The Owner reserves the right to reject any or all bids and to waive any informalities and technicalities in the bid. Any bid may be withdrawn prior to the above schedules time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified will not be considered. No Bidder may withdraw a bid within ninety (90) days after the actual date of bid opening.

Award

Water / Sewer

$2,217,910.00

Public - City

Site Work

19

2

11

9

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
109
Bidding Soon
1,395
All Active Projects
646
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 19, 2021

March 22, 2021

January 7, 2022

img_map_placeholder

Multiple Locations, Anderson, SC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.