Site work for a water / sewer project in Las Vegas, Nevada. Completed plans call for site work for a water / sewer project.
**As of 12/1/2020 project was not yet been awarded. No estimated time frame yet. Miscellaneous Pipeline Replacements Phase I The Sites of the Work are located on Atlantic Street (CLV jurisdiction) between St Louis Avenue and Oakey Boulevard, Bourbon Way (CLV jurisdiction) between Torrey Pines Drive and Salem Drive, and Cameron Street (Clark County jurisdiction) between Tropicana Avenue and Quality Court. The Work on Atlantic Street consists of abandoning in place the existing 6-inch ACP pipeline, fittings, valves and other appurtenances within the limits defined in the construction drawings and replacing it with approximately 1,600 LF of new 8-inch PVC or DIP pipe, fittings, valves and associated appurtenances needed to re-establish lateral connections to existing laterals. The Work also includes installation of two 2-inch backflow prevention devices, three new fire hydrant assemblies, and all other work as required by the contract documents Question Cutoff Date 11/19/2020 01:00:00 PM (ET) . The Work on Bourbon Way consists of abandoning in place the existing 6-inch ACP pipeline, fittings, valves and other appurtenances within the limits defined in the construction drawings and replacing it with approximately 1,580 LF of new 8-inch PVC or DIP pipe, fittings, valves and associated appurtenances needed to re-establish lateral connections to existing laterals. The Work also includes installation of two new fire hydrant assemblies, and all other work as required by the contract documents. The Work on Cameron Street consists of abandoning in place the existing 10-inch ACP pipeline, fittings, valves and other appurtenances within the limits defined in the construction drawings and replacing it with approximately 2,030 LF of new 10-inch PVC or DIP pipe, fittings, valves and associated appurtenances needed to re-establish lateral connections to existing laterals. Of the 2,030 LF, approximately 490 LF shall be concrete encased and approximately 90 LF shall be installed trenchless technology. The Work also includes installation of four new fire hydrant assemblies, and all other work as required by the contract documents
Award
Water / Sewer
$2,646,500.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 24, 2020
January 25, 2021
Multiple Locations, Las Vegas, NV
Related To This Project
Las Vegas, NV
Bid Date: Dec 15 2023
Las Vegas, NV
Bid Date: Nov 21 2023
Las Vegas, NV
Bid Date: Nov 30 2023
Las Vegas, NV
Bid Date: Nov 15 2023
Las Vegas, NV
Bid Date: Nov 16 2023
Las Vegas, NV
Bid Date: Nov 02 2023
Las Vegas, NV
--
Las Vegas, NV
Bid Date: Nov 29 2023
Las Vegas, NV
Bid Date: Oct 26 2023
Las Vegas, NV
Bid Date: Oct 30 2023
Las Vegas, NV
Bid Date: Nov 28 2023
Las Vegas, NV
Bid Date: Nov 13 2023
Las Vegas, NV
Bid Date: Nov 27 2023
Las Vegas, NV
--
Las Vegas, NV
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.