Site work for a water / sewer project in Las Vegas, Nevada. Completed plans call for site work for a water / sewer project.

**As of 12/1/2020 project was not yet been awarded. No estimated time frame yet. Miscellaneous Pipeline Replacements Phase I The Sites of the Work are located on Atlantic Street (CLV jurisdiction) between St Louis Avenue and Oakey Boulevard, Bourbon Way (CLV jurisdiction) between Torrey Pines Drive and Salem Drive, and Cameron Street (Clark County jurisdiction) between Tropicana Avenue and Quality Court. The Work on Atlantic Street consists of abandoning in place the existing 6-inch ACP pipeline, fittings, valves and other appurtenances within the limits defined in the construction drawings and replacing it with approximately 1,600 LF of new 8-inch PVC or DIP pipe, fittings, valves and associated appurtenances needed to re-establish lateral connections to existing laterals. The Work also includes installation of two 2-inch backflow prevention devices, three new fire hydrant assemblies, and all other work as required by the contract documents Question Cutoff Date 11/19/2020 01:00:00 PM (ET) . The Work on Bourbon Way consists of abandoning in place the existing 6-inch ACP pipeline, fittings, valves and other appurtenances within the limits defined in the construction drawings and replacing it with approximately 1,580 LF of new 8-inch PVC or DIP pipe, fittings, valves and associated appurtenances needed to re-establish lateral connections to existing laterals. The Work also includes installation of two new fire hydrant assemblies, and all other work as required by the contract documents. The Work on Cameron Street consists of abandoning in place the existing 10-inch ACP pipeline, fittings, valves and other appurtenances within the limits defined in the construction drawings and replacing it with approximately 2,030 LF of new 10-inch PVC or DIP pipe, fittings, valves and associated appurtenances needed to re-establish lateral connections to existing laterals. Of the 2,030 LF, approximately 490 LF shall be concrete encased and approximately 90 LF shall be installed trenchless technology. The Work also includes installation of four new fire hydrant assemblies, and all other work as required by the contract documents

Award

Water / Sewer

$2,646,500.00

Public - City

Site Work

23

8

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
19
Bidding Soon
441
All Active Projects
215
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2020

January 25, 2021

img_map_placeholder

Multiple Locations, Las Vegas, NV

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.