Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Charleston, South Carolina. Completed plans call for the renovation of a water / sewer project.
https://www.charleston-sc.gov/AgendaCenter/ViewFile/Agenda/_04282022-7380 Plum Island Phase 4 Capital Improvements 539 Harborview Circle Hazen and Sawyer 83.4 C 424-00-00-007 1st Review 5 Acres: # Zoning: Tms#: Submittal Review #: Applicant: Address: Location: James Island Site Plan Owner: Contact: Board Approval Required: Bza-sd, Bza-z Charleston Water System Project Classification: Site Plan Results: Revise and Resubmit to Trc. 843-414-1402 Jared Hartwig Jhartwig@hazenandsawyer.com City Project Id #: Trc-sp2022-000521 New Disinfection and Solids Handling Infrastructure Along With Primary Treatment Facilities. # Lots (for Subdiv): - # Units (Multi-fam./concept Plans): - _________________________________________________________________________________________________ ***As of March 24, 2022 project has not been awarded yet. A timeline for award has not yet been established. The Commissioners of Public Works of the City of Charleston, South Carolina (Owner) is soliciting a Statement of Qualifications (SOQ) from contractors interested in the opportunity to submit a proposal to provide preconstruction and construction services for the Plum Island Water Pollution Control Plant (WPCP) Phase 4 Capital Improvements Project using the Construction Manager at Risk (CMAR) method of project delivery. The Work to be performed consists of major modifications to the Owner's existing 36 MGD Plum Island WPCP and includes construction of a Biosolids Facility (new dewatering building with five (5) rotary fan presses, sludge feed pumping, polymer make-up and feed, dewatered cake conveyance, truck loading, lab, and space for storage and maintenance), one (1) 110-foot diameter concrete Primary Clarifier, two (2) Final Settling Tanks, Process Control Pump Station (PCPS) Improvements, PCPS Discharge Header Modifications, Sodium Hypochlorite Storage and Distribution Facility, new Odor Control System, and Abandonment/Demolition of Existing Facilities. Most of the structures and major piping will be pile supported. The Work includes, but is not limited to, all piping and valves, grading and paving, sedimentation and erosion control, electrical work, instrumentation and controls, HVAC equipment and all other work necessary to render the facilities complete and operational. The planning level estimated construction cost for these modifications is in the range of $50-65 million. Included in the CMAR contractor's scope of services is collaboration with the design engineer during the design phase, providing constructability and value engineering guidance, development of a guaranteed maximum price (GMP) proposal, and, assuming successful negotiation of a GMP with the Owner, ultimately entering into a construction agreement for the construction of the Project. Responses to this RFQ will be evaluated to identify contractors with the requisite experience, qualifications, and resources to complete the Project successfully within an agreed upon GMP in accordance with project requirements that will be specified by the Owner. The details of the project requirements will be presented in the Request for Proposals (RFP), which will be issued at a later date to a short-list of contractors selected by the Owner who will be invited to respond to the RFP based on an evaluation of their submission to this RFQ. This RFQ will place an emphasis on the contractor's demonstrated ability on past projects of similar size, nature, and scope to self-perform significant portions of construction on the Project with their own workforce. The Project consists of major modifications to the Owner's existing 36 MGD Plum Island WPCP and includes construction of a Biosolids Facility (new dewatering building with five (5) rotary fan presses, sludge feed pumping, polymer make-up and feed, dewatered cake conveyance, solids hopper, truck loading, three (3) holding tanks, lab, and space for office, control room, and electrical room), one (1) 110-foot diameter concrete Primary Clarifier, two (2) Final Settling Tanks, Process Control Pump Station (PCPS) Improvements, PCPS Discharge Header Modifications, Disinfection Facility (sodium hypochlorite storage and distribution), new Odor Control System, and Abandonment/Demolition of Existing Facilities. Most of the structures and major piping will be pile supported. The Work includes, but is not limited to, all piping and valves, grading and paving, sedimentation and erosion control, electrical work, instrumentation and controls, HVAC equipment and all other work necessary to render the facilities complete and operational. The planning level estimated construction cost for these modifications is in the range of $50-65 million.
Post-Bid
Water / Sewer
$65,000,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 15, 2020
July 15, 2022
539 Harbor View Cir, Charleston, SC
Related To This Project
Charleston, SC
Bid Date: May 25 2022
Charleston, SC
--
Charleston, SC
--
Charleston, SC
Bid Date: Aug 24 2022
Charleston, SC
Bid Date: Sep 22 2022
Charleston, SC
Bid Date: Sep 09 2022
Charleston, SC
Bid Date: Aug 11 2022
Charleston, SC
Bid Date: May 04 2022
Charleston, SC
--
Charleston, SC
--
Charleston, SC
Bid Date: Feb 24 2022
Charleston, SC
Bid Date: Mar 23 2022
Charleston, SC
Bid Date: Mar 24 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.