BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 1, 2021 at 8:00 PM

Updated January 26, 2024

Demolition, site work and new construction of an educational facility in Bridgewater, Massachusetts. Completed plans call for the demolition of a educational facility; 136,000-square-foot, three-story above grade educational facility; and for site work for a educational facility.

As of April 2021, foundation and sitework is currently ongoing, and steel construction is expected to start by May of 2021. The New George H. Mitchell Elementary School Project consists of the construction of approximately 136,000 SF, three story facility. Work includes, but is not limited to the bulk demolition and removal of existing building foundations, site fencing, erosion control existing underground utilities for the construction of the New George Mitchell, Work also includes the disconnection, termination and capping of existing natural gas, water, storm drainage and electrical systems as required for the demolition of the building. Masonry, Misc. Metals, WaterProofing/Dampproofing/Caulking, Roofing & Flashing, Metal Windows, Glass & Glazing, Tile, ACT, Resilient Flring, Terrazzo, Paint, Elevators, FP, Plumbing, HVAC, Electrical New Mitchell Elementary School located at 500 South Street, Bridgewater, Massachusetts. 15.3% for minorities and 6.9% for women. *This project has been awarded and all trades have been let.

Under Construction

Educational

$49,916,700.00

Public - City

Demolition, New Construction, Site Work

864

67

221

7

Subscribe For Documents

95 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
493
Active Projects
203
Bidding Soon
3,761
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2020

April 1, 2021

Project location map

500 South St, Bridgewater, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.