Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 22, 2020 at 7:00 PM
Updated October 19, 2024
Site work and paving for a road / highway in Augusta, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Total Contractual Days - 500 Days Phase 1 consists of Stage 1A erosion control, clearing & grubbing of easements and r/w, water & sanitary sewer installation (including service connections), private utility relocations (by others)(including service connections), detention pond construction, and miscellaneous sections of cuts/fills and storm sewer installation. Phase 2 consists of acceptance of existing erosion and traffic control measures from Phase 1, installation of new erosion control measures, traffic control, minor grading, storm drainage, roadway, sidewalk, traffic signal, and miscellaneous construction associated with the project. All water, sanitary sewer, dry utilities, and service lines were installed at grades below required Ph2 excavations or outside of Ph2 project footprint. Ph2 contractor shall assume there will be no conflicts with exception to an existing AT&T duct bank. Contract includes a mark-up of AT&T duct bank with pothole depths at various points. County has worked closely with Benesch (Consultant) to design a storm system that will avoid vertical and horizontal conflicts with this duct bank.
Award
Roads / Highways
$8,641,597.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 3, 2020
January 4, 2021
Flowing Wells Rd, Augusta, GA
Related To This Project
Augusta, GA
Bid Date: Nov 02 2024
Augusta, GA
Bid Date: Dec 06 2024
Augusta, GA
--
Augusta, GA
--
Augusta, GA
--
Augusta, GA
Bid Date: Apr 14 2025
Augusta, GA
Bid Date: Dec 18 2024
Augusta, GA
Bid Date: Oct 18 2024
Augusta, GA
Bid Date: Oct 30 2024
Augusta, GA
Bid Date: Oct 02 2024
Augusta, GA
Bid Date: Oct 02 2024
Augusta, GA
Bid Date: Oct 02 2024
Augusta, GA
Bid Date: Oct 02 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
