Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Augusta, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Total Contractual Days - 500 Days Phase 1 consists of Stage 1A erosion control, clearing & grubbing of easements and r/w, water & sanitary sewer installation (including service connections), private utility relocations (by others)(including service connections), detention pond construction, and miscellaneous sections of cuts/fills and storm sewer installation. Phase 2 consists of acceptance of existing erosion and traffic control measures from Phase 1, installation of new erosion control measures, traffic control, minor grading, storm drainage, roadway, sidewalk, traffic signal, and miscellaneous construction associated with the project. All water, sanitary sewer, dry utilities, and service lines were installed at grades below required Ph2 excavations or outside of Ph2 project footprint. Ph2 contractor shall assume there will be no conflicts with exception to an existing AT&T duct bank. Contract includes a mark-up of AT&T duct bank with pothole depths at various points. County has worked closely with Benesch (Consultant) to design a storm system that will avoid vertical and horizontal conflicts with this duct bank.
Award
Roads / Highways
$8,641,597.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 3, 2020
January 4, 2021
Flowing Wells Rd, Augusta, GA
Related To This Project
Augusta, GA
Bid Date: Nov 02 2024
Augusta, GA
Bid Date: Dec 06 2024
Augusta, GA
--
Augusta, GA
--
Augusta, GA
--
Augusta, GA
Bid Date: Dec 18 2024
Augusta, GA
Bid Date: Dec 18 2024
Augusta, GA
Bid Date: Oct 18 2024
Augusta, GA
Bid Date: Oct 30 2024
Augusta, GA
Bid Date: Oct 02 2024
Augusta, GA
Bid Date: Oct 02 2024
Augusta, GA
Bid Date: Oct 02 2024
Augusta, GA
Bid Date: Oct 02 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.