Site work for a civil project in Greenwich Township, New Jersey. Completed plans call for site work for a water / sewer project.

The project consists of the installation of 16-inch diameter cement lined ductile iron pipe in a loop as an extension of the existing chlorine contact pipe. The new piping will connect via two wet taps to the existing 10-inch finished water line. The work is located at the Well No. 5 Water Treatment Plant at 420 Washington Avenue, Gibbstown, NJ. A pre-bid site visit is required. The Township of Greenwich will award the Contract or reject the bids within sixty (60) municipal days after the date of the bid opening. Should there be any reason the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Township of Greenwich and the bidder. Bids must be accompanied by a Certificate of Surety from an acceptable surety and a bid security in the form of a certified check, cashier's check, or bid bond payable to the Township of Greenwich in the amount of ten percent (10%) of the total bid amount but not in excess of $20,000.00. Certificate of Surety shall be written by a surety company listed on the United States Treasury Department Circular 570 and the New Jersey List of Approved Surety Companies. All bidders are required to provide a copy of the contractor's and subcontractors' business registration certificate(s) issued by the Department of the Treasury in accordance with Section 1 of P.L. 2004, c.57 (C.52:32-44). All Contractors and subcontractors must also comply with the "Public Works Contractor Registration Act" (P.L. 2203, c.91); and P.L. 1977, c.33 (Disclosure of Ownership). The successful bidder shall also comply with the provisions of the New Jersey Prevailing Wage Act, Chapter 150 of the Laws of 1963, effective January 1, 1964. The successful bidder must furnish a Performance Bond and Payment Bond, each in the amount equal to one hundred percent (100%) of the contract price. Said bonds must be in a form acceptable to the Township of Greenwich and be issued by a surety authorized to do business in the State of New Jersey. The successful bidder must comply with Affirmative Action requirements pursuant to Public Law 1975 C. 127 (N.J.A.C. 17:27) as revised and amended to date, and must furnish an Initial Project Manning Report (AA201) upon execution of the Agreement. Contractor is advised of the responsibility to file an annual disclosure statement on political contributions with the New Jersey Election Law Enforcement Commission pursuant to N.J.S.A. 19:44A-20.13 (P.L. 2005, c271, s3) if the contractor receives contracts in excess of $50,000.00 from public entities in a calendar year. It is the Contractor's responsibility to determine if filing is necessary. Each Bidder must purchase the Bid Documents from the issuing office in order to submit a bid. 4. Bidders shall adhere to the Local Finance Notice 2020-06 from the New Jersey Department of Community Affairs Division of Local Government Services, "the Division recommends establishing a protocol for hand delivery of bids that limits exposure to pathogens". The protocol includes: Bids will be opened and read aloud in the offices of Sickels and Associates Inc., at the time and date designated in the Notice to Bidders. Any observers of the opening are requested to refrain from person to person contact (i.e. handshaking, etc.) and maintain a minimum of 10 feet of personal space between individuals (i.e. social distancing). Any observers of the bid opening are requested to follow the prevailing health and public safety guidelines from applicable authorities. Bids must be submitted on the bid forms provided within the documents in the manner designated therein. The Township of Greenwich and the Engineer reserve the right to require a complete financial and experience statement from the prospective bidders showing that they have satisfactorily completed work of the nature required before furnishing proposal forms or specifications, or before awarding the contract. A Pre-Bid conference has not been scheduled for this project. The Township of Greenwich reserves the right to reject any and all bids in whole or in part, and to waive any informalities or minor defects therein, should it be deemed in the best interest of the Township of Greenwich.

Award

Water / Sewer

$73,800.00

Public - City

Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Vapor Retarders
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Pest Control Devices
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Rodent Control, Soil Stabilization, Shoring and Underpinning, Vibroflotation and Densification, Densification, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Service Connections, Water Utility Distribution Valves, Fuel Distribution Utilities, Natural-Gas Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
328
Active Projects
176
Bidding Soon
3,816
All Active Projects
1,545
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2020

December 10, 2020

img_map_placeholder

420 Washington St, Greenwich Township, NJ

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Chlorine Contact System Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.