BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in San Diego, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Slurry Seal Group 2023 involves furnishing all labor, materials, equipment,services, and construction related to slurry seal work on existing paved roadways in various areasthroughout the City of San Diego. The work includes: placement of rubber polymer modified slurry(RPMS), crack sealing, removal of humps & pavement irregularities, asphalt mill and pave, anddigouts, pavement base repairs, milling and disposal of pavement fabric, replacing traffic signaldetection loops and stub outs, adjusting existing City manhole frames and covers to grade, raising appurtenances to grade (water, sewer), raising survey monuments to grade, reconstructing surveymonument boxes, street and sidewalk sweeping, removal and replacement of existingthermoplastic striping and markings/legends, installation of striping modifications, traffic controldrawings & permits, weed abatement, storm drain inlet protection, installation of inlet markers,sediment control, and possible night and weekend work. All work would occur within the publicright-of-way (paved streets) or previously disturbed non-sensitive areas only, and outside of theCity's Multiple Habitat Planning Area (MHPA). No sensitive vegetation would be impacted orremoved. Storm Water Best Management Practices (BMPs) for erosion control preventingdischarge, as well as Traffic Control Plan (TCP) would be implemented throughout construction. The project is located in the Community Planning Areas of Carmel Valley, Clairemont Mesa, Mira Mesa, Miramar Ranch North, Pacific Highlands Ranch, Rancho Pensaquitos, Serra Mesa, Scripps Miramar Ranch, Tierrasanta, and University within Council Districts 1, 5, 6, and 7. The City has incorporated mandatory SLBE-ELBE subcontractor participation percentages to enhance competition and maximize subcontracting opportunities. For the purpose of achieving the mandatory subcontractor participation percentages, a recommended breakdown of the SLBE and ELBE subcontractor participation percentages based upon certified SLBE and ELBE firms has also been provided to achieve the mandatory subcontractor participation percentages: 1. SLBE participation 7.3% 2. ELBE participation 7.8% 3. Total mandatory participation 15.1% Any questions related to this solicitation shall be submitted to: Engineering & Capital Projects Department, Contracts Division 525 B Street, Suite 750 (7th Floor) San Diego, California, 92101 Attention: Juan E. Espindola OR: JEEspindola@sandiego.gov Liquidated Damages - $1000.00 per day Project duration - 110 working days Contractors submitting a Bid must be pre-qualified for the total amount proposed, including all alternate items, prior to the date of submittal. The City reserves the right to cancel the Notice Inviting Bids at any time, and further reserves the right to reject submitted Bids, without giving any reason for such action, at its sole discretion and without liability.

Bid Results

Roads / Highways

$3,994,120.00

Public - City

Paving, Site Work

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
26
Bidding Soon
726
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2020

February 1, 2021

img_map_placeholder

Multiple Locations, San Diego, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.