BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Mountain Iron, Minnesota. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

As of 12/11/2020 No start date. As of 11/30/2020 This project has not yet been awarded. Project is expected to be awarded on 12/07/2020. The information for Bidders, Form of Bid, Form of Contract, Plans and Specifications, and Forms of Bid Bond, Performance and Payment Bond, and other contract documents may be examined at the following: Benchmark Engineering, Inc. and the City of Mountain Iron City Hall. Base Bid #2 -Construct Pump House Construct Pump House - 1 Lump Sum substantially completed on or before: August 01, 2021, Final Completion Date: August 31, 2021 the installation and calibration per manufacturer's instructions of the water pipe, fittings, valves, flow meter, gages, pressure transmitter, corporation stops, and sampling tap, connecting the new 10" well discharge pipe to the newly installed 8" HDPE well discharge pipe, which feeds the Mountain Iron Water Treatment Plant. The scope of this Division is the installation of an underground electrical power supply (480 volt/400 amp/3 phase) from a pole-mounted transformer to the well pumphouse building; the installation of all electrical panels, cabinets, conduit, wiring, PLC components and remote I/O, adjustable frequency drive (variable frequency drive), and the complete installation, start-up, tuning, and operator training for the well pump control system.

Award

Water / Sewer

$139,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
9
Bidding Soon
91
All Active Projects
37
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2020

December 21, 2020

img_map_placeholder

To Be Determined, Mountain Iron, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.