Demolition, site work, new construction and addition to a municipal facility in Juneau, Alaska. Completed plans call for site work for a municipal facility; for the demolition of a municipal facility; for the addition of a municipal facility; and for the construction of a municipal facility.
This project includes demolition, removal and reconstruction of Carrol Way and Martin Way stairs, located in Juneau, Alaska. ENGINEERS ESTIMATE RANGE: Between $350,000 and $450,000. COMPLETION OF WORK. The WORK must be completed by October 31, 2024. DEADLINE FOR BIDDER QUESTIONS: 4:30pm Alaska Time on October 25, 2023. SITE OF WORK. The site of the WORK is Carrol Way from Franklin Street to Gastineau Avenue and Martin Way from Franklin to upper end, below Gastineau Ave located in the Downtown area of Juneau, Alaska. Carrol Way. The WORK consists of demolition and removal of approximately 171 feet of existing timber stairways, landings, and footings within Carrol Way right of way and the salvaging of useable landings and stair treads. Construction of new wooden stairway structures and the reuse of existing usable stair treads and landings and construction of stairway approach at the upper end and lower ends of the stairway. The WORK also includes minor grading and drainage, and other miscellaneous related WORK. In addition to the stairway construction there are existing electrical / utility conduits attached to the stairs that shall remain in service, be removed from the existing structure, and installed on the new stairway during construction. Coordination with the various utility companies will be required during the reconstruction of the stairways. Martin Way. The WORK consists of demolition and removal of approximately 122 feet of existing timber stairways, landing, and footings within the Martin Way right of way and the salvaging of useable landings and stair treads. Construction of new wooden stairway structures and the reuse of existing usable stair treads and landings and construction of stairway approach at the upper end and lower ends of the stairway. The WORK also consists of removal and replacement of approximately 150 feet of existing sewer main line, new cleanouts, and new sewer services within the Martin Way right-of-way. The WORK also includes minor grading and drainage, and other miscellaneous related WORK. In addition to the stairway construction there are existing electrical / utility conduits attached to the stairs that shall remain in service, be removed from the existing structure, and installed on the new stairway during construction. Coordination with the various utility companies will be required during the reconstruction of the stairways. The OWNER reserves the right to reject any or all Bids, to waive any informality in a Bid, and to make award to the lowest responsive, responsible Bidder as it may best serve the interests of the OWNER. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Award
Municipal
$449,820.00
Public - City
Addition, Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 9, 2023
December 11, 2023
Multiple Locations, Juneau, AK
Related To This Project
Juneau, AK
Bid Date: Oct 24 2023
Juneau, AK
Bid Date: Nov 28 2023
Juneau, AK
Bid Date: Nov 14 2023
Juneau, AK
Bid Date: Nov 16 2023
Juneau, AK
Bid Date: Nov 16 2023
Juneau, AK
Bid Date: Nov 15 2023
Juneau, AK
Bid Date: Oct 24 2023
Juneau, AK
Bid Date: Nov 03 2023
Juneau, AK
Bid Date: Oct 17 2023
Juneau, AK
Bid Date: Oct 12 2023
Juneau, AK
--
Juneau, AK
Bid Date: Oct 05 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.