BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 8, 2021 at 7:00 PM

Updated January 29, 2026

Site work for a playground / park / athletic field in Las Vegas, Nevada. Completed plans call for site work for a playground / park / athletic field.

**As of 12/15/2020 project was not yet been awarded. No estimated time frame yet. Location: Clark County Government Center, 500 South Grand Central Parkway, Fourth Floor, Las Vegas, Nevada 89106. A requirement of the contract includes a certification that Bidder is not currently engaged in, and agrees for the duration of the contract not to engage in, a boycott of Israel. Package is available on the NGEM portal or by calling (702) 455-2897. Hearing impaired customers please call TT/TDD: Relay Nevada toll-free (800) 326-6868. Question Cutoff Date: 11/12/2020 01:00 PM (ET) Paul Meyer Park: Synthetic Turf Replacement and is located at 4525 New Forest Drive, Las Vegas, Nevada 89147The Work consists removal and proper disposal of approximately 45,000 +/- square feet of existing synthetic turf and replacing it with new synthetic turf system. Construction includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications: Work includes, demolition and disposal of existing infilled synthetic turf and in fill, import and placement of permeable aggregate materials, finish grading, selective demolition and replacement of concrete mow curb, turf edge anchor, installation of infilled synthetic turf including lines and markings and any incidental measures or materials required to accomplish this work. Site Cleaning; Concrete Reinforcing; Cast in Place Concrete; Earthwork, Synthetic Turf; and Permeable Crushed Aggregate Base as specified. Desert Breeze Park: Synthetic Turf Replacement and is located at 8275 Spring Mountain Road, Las Vegas, Nevada 89147 The Work consists removal and proper disposal of approximately 160,350 +/- square feet of existing synthetic turf and replacing it with new synthetic turf system. Construction includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications: Work includes, demolition and disposal of existing infilled synthetic turf and in fill, import and placement of permeable aggregate materials, finish grading, selective demolition and replacement of concrete mow curb, turf edge anchor, installation of infilled synthetic turf including lines and markings and any incidental measures or materials required to accomplish this work. Site Cleaning; Concrete Reinforcing; Cast in Place Concrete; Earthwork, Synthetic Turf; and Permeable Crushed Aggregate Base as specified

Award

Playgrounds / Parks / Athletic Fields

$2,209,093.00

Public - County

Site Work

6

18

18

6

Subscribe For Documents

75 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
0
Bidding Soon
279
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2020

January 6, 2021

Project location map

Multiple Locations, Las Vegas, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.