BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Rancho Palos Verdes, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of January 27, 2021, project has not been awarded. The general items of work include construction of curb, sidewalk, curb ramps, AC pavement, landscape and irrigation restoration, and all other items that are required to complete the work. The work to be done shall include furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents, in the City of Rancho Palos Verdes, California. All work shall be completed within the contract period of Twenty (25) Working Days following Notice to Proceed. Anyone obtaining Contract Documents must immediately supply the Director of Public Works with a facsimile number and email address such that Addenda and other information may be transmitted as rapidly as possible. Failure to provide such a facsimile number and email address may result in late notification. In any case, City does not guarantee Addenda will be faxed or emailed, and Bidder shall be responsible for all Addenda regardless of whether Bidder received any such fax or email. If you discover any error, omission, ambiguity or conflict in the Plans or Specifications and wish to have a clarification, please fax or email your request for clarification to the Director of Public Works at publicworks@rpvca.gov such that it is received by him/her no later than close of business on December 4th 2020. Requests for clarification received after this date will be disregarded. Please indicate the Project in your request for clarification. Responses will be provided by Monday December 7th, 2020. PREVAILING WAGES: Pursuant to the Labor Code of the State of California, the Director of Industrial Relations has determined the general prevailing rate of wages and employer payments for health and welfare, vacation, pension and similar purposes applicable to the work to be done. This rate and scale are on file with the Director of Public Works and copies will be made available to any interested party on request. The Contractor to whom the contract is awarded, and the subcontractors under him must pay not less than these rates for this area to all workers employed in the execution of this contract. This Project is subject to compliance monitoring and enforcement by the DIR. Each Bid must be accompanied by a cash deposit, cashier's check, certified check or Bidder's Bond issued by a Surety insurer, each of which must be made payable to the City, in an amount not less than ten percent (10%) of the total Bid submitted. Personal or company checks are not acceptable. Upon award of Contract, Contractor shall provide faithful performance and payment Bonds, each in a sum equal to the Contract Price. Before acceptance of the Project, Contractor shall submit warranty/maintenance Bonds that are valid for one year from acceptance, in the amount of one hundred percentage (100 %) of the Contract Price; in lieu of the warranty Bond, Contractor may submit proof from the Surety that the performance Bond has been extended for the appropriate duration of time. All Bonds must be issued by a California admitted Surety insurer and submitted using the required forms, which are in the Contract Documents, or in any other form approved by the City Attorney. Failure to enter into a valid Contract, including the submission of all required Bonds and insurance coverages, with the City within fifteen (15) Days after the date of the delivery of the Contract forms to the Bidder, shall constitute a material breach and subject the Bid security to forfeiture to the extent provided by law. LICENSE: The bidder must possess a Class A contractor's license in California. No contract will be awarded to any bidder who is not a properly licensed California contractor as required by the California Business and Professions Code. The successful Contractor must also possess a current City business license LIQUIDATED DAMAGES: There is a $300 per day assessment for liquidated damages for each calendar day that work remains incomplete beyond the time specified for the completion of the work. Refer to the bid specifications and contract documents for further details. BIDDING PROCESS: The City reserves the right to reject any or all bids or any parts thereof and waive any irregularities or informalities in any bid or in the bidding and to make awards in all or part in the best interest of the City. No bidder may withdraw his bid for a period of ninety (90) days after the date set for the opening bids.

Bid Results

Sidewalks / Parking Lot

$103,500.00

Public - City

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
554
Active Projects
272
Bidding Soon
4,041
All Active Projects
1,778
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 16, 2020

February 27, 2021

March 9, 2021

img_map_placeholder

Multiple Locations, Rancho Palos Verdes, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.