BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2021 at 7:00 PM

Updated June 25, 2024

Renovation of an educational facility in San Antonio, Texas. Completed plans call for the renovation of a educational facility.

For Science Fume Hood Replacement at Oliver Wendell Holmes High School The Project is generally described as follows: replace 4 exhaust fans. Provide air flow measuring stations and new control damper actuators for 22 fume hoods. Replace utility controllers for 14 classrooms as indicated on the drawings and specifications to include all general construction, site work, heating, air conditioning, electrical, plumbing and all other work as indicated on the construction documents This project requires a Bid Bond.

Award

Educational

$582,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
6
Bidding Soon
1,543
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2020

December 16, 2020

Project location map

6500 Ingram Rd, San Antonio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.