BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2021 at 7:00 PM

Updated May 10, 2025

Site work for a water / sewer project in Kalamazoo, Michigan. Completed plans call for site work for a water / sewer project.

This work consists of cutting out existing 16" valves and furnishing and placing all materials required to install new 16" butterfly valves at Central Wellfield, 215 W. Stockbridge Avenue. For Central Wellfield Valve Replacement Questions about this IFB should be directed to: Department Contact: Anna Crandall, Senior Civil Engineer, Water Resources at crandalla@kalamazoocity.org Description. This work consists of cutting out existing 16" valves and furnishing and placing all materials required to install new 16" butterfly valves at Central Wellfield, 215 W. Stockbridge Avenue.

Award

Water / Sewer

$64,633.00

Public - City

Site Work

3

1

2

4

Subscribe For Documents

222 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
98
Bidding Soon
1,406
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2020

January 1, 2021

Project location map

215 W Stockbridge Ave, Kalamazoo, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.