BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 11, 2020 at 7:00 PM

Updated September 11, 2024

Site work for a bridge / tunnel in Dewberry, Alberta. Completed plans call for site work for a bridge / tunnel.

Bridge Culvert Replacement and Other Work 45:12 BF 80529 - Carrying Hwy 45 over an Unnamed Watercourse, Northeast of Dewberry Kilometre 1.906 to 1.906 Central Region APPROXIMATE QUANTITIES: 1 Lump Sum Demolition and Disposal of Bridge Structure 1 Lump Sum Excavation - Structural 72 Metres CSP with Couplers - Supply (2.4 m Dia.) 72 Metres CSP - Assembly (2.4 m Dia.) 70 Cubic Metres Heavy Rock Riprap (Class 1) 0.1 Kilometres New Fence - Supply and Install - Class B 200 Square Metres Erosion Control Soil Covering - Supply and Install (Type B) Contractor to supply all materials.

Bid Results

Bridges / Tunnels

$564,492.00

Public - State/Provincial

Site Work

4

1

6

5

Subscribe For Documents

99 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
48
Bidding Soon
512
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2020

January 11, 2021

Project location map

AB-45, Dewberry, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.