BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Wilmington, Ohio. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The City of Wilmington, Department of Public Service/Safety, herein after referred to as "the City," intends to use a Quality Based Selection (QBS) Process in accordance with Ohio Revised Code (ORC) Section 153.65 to 153.71 for the purpose of selecting a professional engineering services firm to design the Clarksville Connector, Phase 1 project. The objective of this Request for Qualifications (RFQ) is to establish a Professional Services Agreement with a qualified firm that meets the City's requirements for the design of the Clarksville Connector, Phase 1 project. The City wishes to construct a multi-use trail beginning at the terminus of the Luther Warren Peace Path on Nelson Avenue and proceeding approximately 3.2 miles to the west, ending at Ogden Road. The trail will be constructed on City-owned land adjacent to the City's current wastewater treatment plant and landfill, then continuing west of these City facilities. The planned alignment will fall entirely within parcels of the abandoned rail corridor. The remaining parcels of abandoned rail corridor required to construct the trail are in the process of being donated to the City. Separate from this project, the City has received bids for a design-build project to reconstruct four (4) bridges on the abandoned rail bridge abutments. The City is currently reviewing the bids for the design-build project and expects that the selected design consultant of the trail (via this contract) will design the trail to tie into the proposed bridges to be constructed by a design build team (DBT). The scope of work may include, but is not limited to, the following. The project will be developed to meet City of Wilmington standards. ODOT and other agency standards shall only be used in the absence of City standards. The City expects that the Consultant will develop a more detailed scope of services. Professional Engineering and Surveying Services: o Limited topographic survey within the bounds of the construction limits. Consultants are encouraged to be innovative with their survey approach. The City does not wish for the entire length of the corridor to be surveyed topographically. o Prior to proceeding to the design stage, the Consultant shall prepare a conceptual layout of the trail alignment on the City parcel adjacent to the City Landfill. The conceptual plan shall consider the full build-out of the Landfill per the master plan as well as providing an access roadway adjacent to the trail. A meeting shall be held with the City to discuss findings o Use of available ODOT and Clinton County GIS linework and shapefiles for various elements such as parcel and right-of-way lines, aerial photography, contours, LIDAR, etc. o Prepare engineering plans and drawings for the length of the trail. In areas where detailed design is not required, consultant shall prepare the required notes and details to provide enough information for the contractor to build the trail. The City will not require fully detailed ODOT-style construction plans. o Complete a preliminary plan package submittal over existing conditions basemap. Consultant to prepare enough detail with the preliminary design plan package to inform the City of the critical design elements. Consultant also to prepare an updated cost estimate. o Complete a final plan package submittal that include complete plans, notes, details, a general summary of quantities, and associated specifications. Consultant to prepare an updated cost estimate. It is a critical project requirement that the consultant provides the Final Plans on or before January 29, 2021. Questions regarding this RFQ should be directed via e-mail to Andrea Tacoronte at publicservice@wilmingtonoh.org by 2:00 PM, November 12, 2020. No questions will be addressed after this time/date. The project has a completion date of November 30, 2021 to spend all received grant monies. Project has awarded to Woolpert The method of contractor selection has not been determined at this time.

Conceptual

Roads / Highways

$2,522,601.00

Public - City

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
70
Bidding Soon
1,515
All Active Projects
542
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2021

img_map_placeholder

Multiple Locations, Wilmington, OH

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.