Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Champaign, Illinois. Design plans call for site work for a road / highway; for paving for a road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.
This project may contain Federal Funds. This project requires 21% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0 The Consultant selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on March 2, 2021 at 10:00 AM at the Region Three/District Five Office in Paris Phase III engineering services are required for construction inspection, supervision, construction layout, material testing, and record maintenance. Work includes, but not limited to, earthwork, pavement reconstruction, precast concrete pipe and drainage structures, precast prestressed beams, various types of ramp construction, removal of existing 4-span bridges and replacement with 2-span structures, noise abatement wall, lighting, landscaping and safety improvements. Any and all incidental and collateral work necessary to complete the reconstruction and reconfiguration of the I-74 over I-57 interchange west of Champaign, IL The following structures are included in this project: o S.N. 010-1001: Ramp E over I-74/I-57 o S.N. 010-1002: Ramp G over Ramp F o S.N. 010-1003: Ramp G over Ramp F o S.N. 010-1004: Ramp D over I-74/I-57 o S.N. 010-1005: Ramp B over Ramp C o S.N. 010-1006: Ramp B over Ramp C o S.N. 010-1018 (WB): I-74 bridge over I-57 o S.N. 010-1019 (EB): I-74 bridge over I-57 o S.N. 010-2043: I-74 over Copper Slough o S.N. 010-2044: I-57 over Copper Slough o S.N. 010-8174: I-57 over Ditch o S.N. 010-8172: I-74 over Ditch o S.N. 010-8173: I-74 over Ditch The anticipated construction completion date is December 31, 2025. The Consultant must complete and submit final measurements, calculations and final contract records documents to the department no later than six (6) weeks after the completion of the project. Questions concerning should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS) The method of contractor selection has not been determined at this time. IDOT - 19 - RFQ Engineering - Interchange Reconstruction Project, Phase III Construction Inspection
Design
Bridges / Tunnels
$10,000,000.00
Public - State/Provincial
Demolition, New Construction, Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 3, 2021
I-57 and I-74, Champaign, IL
Related To This Project
Champaign, IL
Bid Date: Sep 30 2022
Champaign, IL
--
Champaign, IL
Bid Date: Sep 29 2023
Champaign, IL
Bid Date: Sep 29 2023
Champaign, IL
Bid Date: Oct 17 2023
Champaign, IL
Bid Date: Oct 06 2023
Champaign, IL
Bid Date: Oct 06 2023
Champaign, IL
Bid Date: Apr 29 2022
Champaign, IL
Bid Date: Mar 11 2022
Champaign, IL
Bid Date: Mar 11 2022
Champaign, IL
Bid Date: Mar 11 2022
Champaign, IL
--
Champaign, IL
--
Champaign, IL
Bid Date: Apr 05 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.