BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Aurora, Colorado. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and water / sewer project.

The Chambers Road over Sand Creek Bridge Rehabilitation project will repair and perform bridge preventative maintenance on the existing structure, including bridge rail replacement, guardrail installation, expansion joint removal, spall and deteriorated concrete repair, joint sealant, and abutment cap repair. The project will also perform other elements required to complete the work such as construction traffic control, stormwater management and erosion control, and identification of existing utilities to prevent utility impacts. All right-of-way required to complete the project has been completed prior to advertisement of the project. Work performed shall include, but is not limited, to: Anticipated Construction Period: September 2022 to January 2023. A warranty period will not be applicable to this project. Any reference to a warranty period throughout this Project Manual or any of its Attachments shall be disregarded. Selected Contractor shall reference the following project numbers on all correspondence to the City of Aurora (COA) or Colorado Department of Transportation (CDOT): City of Aurora: 19076 / 5888A CDOT Subaccount: 23050 CDOT SAP: BRO M055-051 Work not specifically called for but that is needed to accomplish a successful project under this contract should be considered as part of the work to be performed, whether specifically detailed or not. Buyer's Requirements Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Bid Deposit Required - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Question Acceptance Deadline 08/16/2022 05:00 PM EDT Questions are submitted online No Interested parties may join the meeting by using the following event link: Or join by entering a meeting ID Meeting ID: 220 899 793 528 Passcode: b6D6xW

Post-Bid

Bridges / Tunnels

$300,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
39
Bidding Soon
982
All Active Projects
411
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2022

September 15, 2022

img_map_placeholder

Chambers Rd, Aurora, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.