BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 16, 2025 at 8:00 PM

Updated April 17, 2025

Paving and addition to a road / highway in Pflugerville, Texas. Design plans call for the addition of a road / highway; and for paving for a road / highway.

UPDATE :Design and full reconstruction for widening of the existing roadway to a three-lane roadway section from Pecan St. to Killingsworth Ln. Improvements include curb and gutter, intersection improvements, street lighting, underground storm... : Project is in City of Pflugerville capital budget fy 2025- CIP ______________________________________________________________________ UPDATE : https://city-pflugerville-tx-budget-book.cleargov.com/6545/capital-improvements/capital-plan-by-fiscal-year A detailed scope has not yet been determined. Project is included City of Pflugerville FY 2023-2027 Budget CIP. ------------------------------------------------------------------------------------------------------------------- 2020 Transportation Bond - City of Pflugerville Proposition A bond for $101.7 million projects include: Immanuel Rd (estimated cost $12.6 million) - Design and full reconstruction for widening of the existing roadway to a three-lane roadway section. To include curb and gutter, intersection improvements, street lighting, underground storm infrastructure, and designated pedestrian facilities. As of December 23, 2021, the project is included in the FY 2022-2026 CIP. A design engineer has been selected. Construction is anticipated to begin in the first quarter of 2023 and be completed in the first quarter of 2025.

Design

Roads / Highways

$2,158,832.00

Public - City

Addition, Paving

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
5
Bidding Soon
1,663
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

Multiple Locations, Pflugerville, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.