BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 22, 2021 at 7:00 PM

Updated June 17, 2025

Site work, paving and outdoor lighting for a mixed-use development in Coachella, California. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; water / sewer project; and sidewalk / parking lot.

As of 12/21/2021 project was already awarded for $3,083,148.50. The general scope of work includes providing sustainable, multi-mobile transportation improvements along with utility under grounding along 6th Street all within the Pueblo Viejo Downtown are in the City of Coachella. The proposed work includes both roadway narrowing and widening,construction of curb,curb/gutter,sidewalk,bike way,driveway approaches and driveways, asphalt pavement with base,cold milling and overlay,street signing and striping,bike lane striping,parkway landscaping and irrigation,street scape with lighting and other amenities, shade structures, and under grounding of existing overhead utility facilities. The full project shall be completed within 120 Working Days from the date specified in the Notice to Proceed.All gradinq, pavinq, underqround utilities, conduits, curbs, qutters, spandrels,access frames, sidewalks, street liqht footinqs, and sleeving, on Mario Lazcano Way shall be completed within 60 Working Days after the commencement date listed on the Noticeto Proceed in order to be able to seen the road to the residents, public, and emerqency services. Landscape,liqhtinq installations, and wall construction can occur afterwards.provided the area is maintained in a clean and safe condition at all times.Time for the commencement and completion of the work is important and is to be of the essence of the Contract. ThesuccessfulbiddershouldplantoprovidePreliminaryProjectSchedules,Traffic Control Plans,and other specified Submittals for review,and order any long lead time equipment items immediately following the Notice of Award. The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent(100%)of the Contract Price. Each bond shall be in the forms set forth here in,shall be secured from a surety company that meets all State of California bond in requirements,as defined in California Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer. The city shall award the contract for the project to lowest responsive, responsible bidder as determined by the city from the total sum of the base bid and additive alternates A and B. For Further information or questions , contact leonard R. St. sauver, Construction project co- ordinator at lstsauver@coachella.org or 442 307 - 4947. Please send all formal requests for information to lstsauver@coachella.org before 2:00 P.M on monday November 22, 2021 . No formal RFI s will be accepted after this date and time. The City Reserves the Right to Waive Informalities and to Reject All Proposals at Its Sole Discretion. Consultants Are Encouraged to Keep Their Proposals Brief and Relevant to the Specific Work Required.

Award

Roads / Highways

$3,083,149.00

Public - City

Outdoor Lighting, Paving, Site Work

54

5

2

7

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
263
Active Projects
108
Bidding Soon
1,339
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2021

February 1, 2022

Project location map

Multiple Locations, Coachella, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.