Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a water / sewer project in Middleton, Wisconsin. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
upgrades to the Tiedeman Pond stormwater lift station including a new intake structure, intake piping, boardwalk replacement, and dredging within Tiedeman Pond. The work also includes: installation of a new pump within the existing wet well; replacement of valves and piping and construction of a new valve vault; new electric and pump controls, and remote control access. The work also includes installation of concrete maintenance pad, retaining wall, stairs and railing, and associated erosion and sedimentation controls and site restoration work. The City is flexible on scheduling this work, intended to be pursued sometime between January 4, 2021 and May 28, 2021 with substantial completion within 90 calendar days of starting. CONTRACTOR shall prosecute the work continuously once started. No Bid will be received unless accompanied by a surety in a form acceptable to the City equal to at least 5% of the maximum Bid, payable to the OWNER. Questions regarding the Bid Request can be directed to Erik Sorensen, PE, of MSA Professional Services at (608) 242-6603 or esorensen@msa-ps.com. The City of Middleton reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 85 days after the time set for receiving Bids (consisting of up to: 60 days for issuance of Notice of Award; 15 days for Contractor to return signed agreements, bonds and insurance; and 10 days for City execution of agreement). Contract award shall be made based on the lowest responsive and responsible Bidder. Published by the authority of the City of Middleton. Lorie J. Burns, City Clerk
Award
Water / Sewer
$525,244.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 3, 2020
January 4, 2021
To Be Determined, Middleton, WI
Related To This Project
Middleton, WI
Bid Date: Mar 29 2022
Middleton, WI
Bid Date: Feb 17 2022
Middleton, WI
Bid Date: Feb 03 2022
Middleton, WI
Bid Date: Apr 08 2022
Middleton, WI
Bid Date: Sep 27 2023
Middleton, WI
Bid Date: Oct 11 2023
Middleton, WI
Bid Date: Oct 11 2023
Middleton, WI
Bid Date: Dec 07 2023
Middleton, WI
Bid Date: Feb 24 2022
Middleton, WI
Bid Date: Mar 03 2022
Middleton, WI
Bid Date: Jan 13 2022
Middleton, WI
Bid Date: Dec 16 2021
Middleton, WI
--
Middleton, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.