BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in Santa Ana, California. Completed plans call for the renovation of a recreation facility.

City of Santa Ana (City) is soliciting competitive bids from qualified contractors to furnish labor, equipment and materials for services including, but not limited to, remove and replace the roof on the Concession / Cafe Building and Ticket Sales Building, at the Santa Ana Zoo. I. Cafe Area - 2850 SF (Contractor to verify) 1. Remove all existing debris from roof and dispose of at contractor's expense. 2. Prep roof field for system installation. 3. Install GAF 50mil Fleeceback System, per manufacturer specifications; includes all roofing-related details. 4. Remove existing coping. 5. Replace all conductor heads and downspout to match existing. 6. Replace all wood blocking with new DuraBlok blocking and install new hardware. 7. Install new 24 gauge bonderized metal coping. 8. Raise all vent curbs, duct curbs, pipe penetrations, and flashings as needed to reach a minimum 8 inches of height above finished roof surface. 9. All appurtenant finish and tie-in work should be performed in a thorough and professional manner. II. Ticket Sales Area - 350 SF (Contractor to verify) 1. Tear-off one existing layer of roof down to the deck. 2. Thoroughly inspect the plywood deck for any dry rot or deterioration damage. 3. If necessary, replace plywood. 4. Once roof field is prepped for system installation, install 1/4 " Securock, mechanically attached, to roof field 5. Install GAF 50mil Single-ply System, per manufacturer specifications; includes all roofing-related details. 6. All appurtenant finish and tie-in work should be performed in a thorough and professional manner. 7. At all times, housekeeping procedures be in effect. 10. At all times, housekeeping procedures should be in effect. Bid Valid minimum 90 days Liquidated Damages $500/day License Requirements Class C-39 Roofing, Class A Q&A Deadline November 23, 2020 2:00 PM (Pacific)

Under Construction

Amusement and Recreation

$40,270.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
111
Bidding Soon
2,391
All Active Projects
1,068
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2020

January 25, 2021

img_map_placeholder

1801 E Chestnut Ave, Santa Ana, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.