BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2021 at 7:00 PM

Updated September 14, 2023

Site work for a bridge / tunnel in Southaven, Mississippi. Completed plans call for site work for a bridge / tunnel.

Qualified Prime (General) Contractors, Subcontractors, and Material Suppliers may download or purchase hard copies or the set(s) of plans and specifications upon request and payment from Memphis Reprographics. Any questions or issues contact Memphis Reprographics. General Contractor Plan holders should register with Memphis Reprographics to be added to the Prime Contractors list. In order to be added to Prime Contractors list, you must register a free account with Memphis Reprographics. Plan holder information will be made public. Partial Sets will not be issued. As a courtesy, copies of plans and specifications will be placed in plans rooms in major cities within the area, locally, and elsewhere as bona-fide requests are received. Proposals shall be submitted in duplicate only upon the blank proposal forms provided with the specifications and must be accompanied by Proposal Security in the form of Certified Check or acceptable Bid Bond in the amount equal to at least five percent (5%) of the Base Bid: such security to be forfeited as liquidated damages, not penalty, by any bidder who fails to carry out the terms of the proposal, execute contract and post Performance Bond in the form and amount within the time specified. The Bid Bond, if used, shall be payable to the Owner. Bids on the Project must be received on or before the period scheduled for the project and no bid withdrawn after the scheduled closing time for the project for a period of forty-five (45) days. All bids submitted in excess of $50,000.00 shall contain on the outside or exterior of the envelope or container of such bid, the contractors Certificate of Responsibility number issued by the Mississippi State Board of Contractors. The Owner reserves the right to reject any and all bids on any or all projects and to waive informalities or irregularities. Located at the intersection of May Blvd. & Getwell rd., the city of Southaven will be constructing the Snowden Pedestrian bridge as a landmark entrance to the Snowden district as well as the east/west connector between the new Silo Square development & the Snowden Grove Park. Minor street work & utilities will be modified/ re-routed to improve the city intersection and allow adequate footprint space for the pedestrian bridge support structures to be located in the May Blvd. medians on the east & West Side of Getwell Rd. The bridge support structures will be a combination of cmu masonry, cast-in-place concrete & steel to support a mostly brick & stone clad aesthetic with painted steel accents. Exposed steel stairs & elevator access is provided on both sides of Getwell Rd. The bridge structure itself will be designed in detail by a bridge manufacturer to be a pre-fabricated steel structure and installed by the selected contractor. Signage, lighting, signals & other miscellaneous components will need to be installed to complete the construction of the bridge. In addition to the bridge structure, two (2) new traffic poles will be in the scope of work as well as new traffic/ crosswalk striping to accommodate modifications of traffic routes

Award

Bridges / Tunnels

$1,998,158.00

Public - City

Site Work

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
49
Bidding Soon
585
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2020

February 15, 2021

Project location map

May Blvd & Getwell Rd, Southaven, MS


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.