Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving, environmental remediation, asbestos abatement, outdoor lighting, new construction, remodeling and renovation of a detention facility in Butner, North Carolina. Completed plans call for the renovation of a detention facility.
As of December 18,2020 the project is not yet awarded. A timeline for award has not yet been established. Solicitation no-59Y-0121-00001 Renovations to campus dormitory cottages A, & B, that include but are not limited to: cleaning patching & painting selected surfaces, hard metal security ceilings & full height utility chase doors at sleeping room corridors, renovation of an accessible student room, replace selected plumbing fixtures, ICON remote flushing system, domestic hot water heaters, DDC controls for HVAC system, electrical service & distribution, change lighting to LED, electric devices & equipment connections, fire alarm & detection, data & telecommunication, emergency generators Renovations to school classroom side of Building C (not vocational building wing) includes but is not limited to: cleaning patching & painting selected surfaces, replace damaged corridor & classroom VCT as indicated, replace Gym VCT flooring, replace all pairs of exterior exit doors, replace gym upper windows, sand-blast and paint gym exterior metal, security cameras in classrooms, electronic lock security system at all exit doors, lock interface to fire alarm panel, alarm & detection, electrical repairs, room alterations & plumbing to replace missing fixtures in women's gang toilet room, data & telecom. Entry sally-port fencing, gate & controls (with intercom and security cameras) at the main entrance, & related site work. Bids will be received for a single prime contract. All proposals shall be lump sum. Pre-Bid Meeting: Bidders attending the meeting are required to wear a face mask at all times and will be asked to adhere to state social distancing recommendations per Spec Section 00 2213 NCDPS Central Engineering Special Conditions Document Sec 1.8 COVIDD19 Requirements. Provide one of the following with Bid Form Proposal: All questions must be submitted in writing, by e-mail, or fax to MHAworks, Attention: William N. Gardner, AIA (wgardner@mhaworks.com), (919.682.2870) (fax: 919-682-5369) no later than 2:00 pm on Wednesday, December 9th , 2020. The last Addendum will be issued at 2 pm on Wednesday December 10th 2020 Identification of HUB Participation and Affidavit A - Listing of Good Faith Efforts or Affidavit B- Intent to Self-Perform with Own Forces Addendum #1 & #2 have been issued. complete all work hereunder within 250 consecutive calendar days of said date
Award
Jails / Prisons
$3,961,911.00
Public - State/Provincial
Asbestos Abatement, Environmental Remediation, LEED Certification, New Construction, Outdoor Lighting, Paving, Remodeling, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2020
February 15, 2021
100 Dillon Dr, Butner, NC
Related To This Project
Butner, NC
Bid Date: Apr 07 2022
Butner, NC
Bid Date: Mar 03 2023
Butner, NC
Bid Date: Dec 22 2022
Butner, NC
Bid Date: Apr 21 2022
Butner, NC
Bid Date: Apr 25 2022
Butner, NC
Bid Date: Apr 28 2022
Butner, NC
Bid Date: Dec 16 2022
Butner, NC
Bid Date: Feb 07 2019
Butner, NC
Bid Date: Jan 24 2023
Butner, NC
Bid Date: Feb 07 2019
Raleigh, NC
--
Garner, NC
Bid Date: Jul 15 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.