BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Sullivan, Wisconsin. Completed plans call for the renovation of a water / sewer project.

The proposed scope of work will include the following: Combining treatment from the Town of Sullivan Sanitary District No. 1 and the Village of Sullivan into a single treatment facility at the District's existing WWTF. The District's existing WWTF will be converted into the Commission's WWTF, improvements to that site will include renovation of the existing District pump station and administration building, construction of a new process control building to house influent screening and sampling, RAS pumping, chemical feed, electrical and water system components, construction of a new oxidation ditch, construction of two new covered circular final clarifiers with UV disinfection and effluent flow metering, renovation of the existing final clarifier into an aerated sludge holding tank, construction of a new concrete sludge storage tank, installation of new blowers into the existing shed, installation of a new SCADA system and standby generator, demolition of the existing oxidation ditch and sludge drying beds, and construction of a new well. Improvements to the Village's existing WWTF will include construction of a new pump station and associated building, installation of a new standby generator, minor renovation of the existing administration building, and demolition of the existing primary and intermediate clarifiers, trickling filter, oxidation ditch and final clarifier, sludge drying beds, and site piping. Work common to each site will include site work to include erosion control, site piping, road construction and paving, grading and landscaping, HVAC, plumbing, and electrical to support the new buildings, and electrical and SCADA improvements at the District and Village's remote lift station sites. A separate Contract B will install a force main between the Village and Commission WWTF to convey the Village's wastewater to the new WWTF. Bidders must submit the Bidders Proof of Responsibility to the Sullivan Joint Wastewater Commission as per Section 66.0903 of the Wisconsin Statutes. Each bidder must deposit, with his bid, security in the amount of 5% of the maximum bid amount. Bidders must be experienced in municipal pipeline and lift station construction. This project will be funded in part by USDA Rural Development and may be funded by the Clean Water Fund (CWF) established under Wisconsin State Statutes, as administered by the Wisconsin Department of Natural Resources. Neither the State of Wisconsin nor any of its departments, agencies, or employees is or will be party to this invitation for bids or any resulting contract. Questions regarding the work can be addressed to Town and Country Engineering, Inc. of Madison, Wisconsin. Goals for minority participation for each trade = 7.0% (Jefferson County) o Goals for female participation in each trade = 6.9% WAGE RATES: (only required if CWF funding is used with additive bid item) This project consists of constructing 1,000 feet of new wharf, building a one-story 2,585 square foot precast concrete stevedore support building, construct electrical infrastructure for ship-to-shore crane power, dredging of ~470,000 cubic yards of wet and dry excavation. Also, clearing, grubbing, and placement of fill material for land development.

Award

Water / Sewer

$7,297,174.00

Public - City

Renovation

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
56
Bidding Soon
1,347
All Active Projects
590
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2020

January 15, 2021

img_map_placeholder

To Be Determined, Sullivan, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.