BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Hemet, California. Completed plans call for site work for a water / sewer project.

The 7 tanks are located at 4 separate sites. The Bee Canyon and Cunningham Tanks are located in the east Hemet area and the Tank Farm and Goldshot Tanks are located in Garner Valley area. All sites are located in the unincorporated area of Riverside County. The Work includes the preparation and recoating of all interior surfaces of the District's Bee Canyon, Cunningham, Tank Farm and Goldshot Tanks in accordance with these specifications. The Bee Canyon Tank is a 500,000 gallon (nominal capacity) welded steel tank (24' tall x 29.83' diameter). The Cunningham Tank is a 120,000 gallon (nominal capacity) bolted steel tank (24' tall x 60' diameter). The Tank Farm includes 4 separate tanks, all 4 of which are 22,000 gallon (nominal capacity) bolted steel tanks with the same dimensions (8' tall x 21.66' diameter). The Goldshot Tank is a 300,000 gallon (nominal capacity) welded steel tank (24' tall x 47' diameter). Areas to be coated shall include all interior surfaces, including but not limited to, shell, roof plates, rafters, framing, columns, reinforcing, ladder, floor, piping, and access manholes. District staff will drain the tank down to the floor via an existing floor drain. The Contractor shall be responsible for draining the remaining residual water, drying and cleaning.District may also perform minor repairs to corroded parts ofthe shell, ladder, and other components. Contractor must accommodate District stafffor a maximum of 3 working days including providing use of contractor's scaffolding or lifts and ventilation. Pre-Qualification for Bidders: Not Required License Type Required: Class A General Engineering/Class C-33 Painting Liquidated Damages: $600.00 Per Calendar Day Bid Bond Percentage: 10%

Award

Water / Sewer

$401,845.00

Public - City

Site Work

6

1

4

7

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
87
Bidding Soon
1,781
All Active Projects
826
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2021

February 8, 2021

img_map_placeholder

Multiple Locations, Hemet, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.