BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of an educational facility in Tacoma, Washington. Completed plans call for the remodel of a educational facility.

PIERCE COLLEGE FORT STEILACOOM Please direct questions regarding this project to the office of the Consultant, McGranahan Architects. 2111 Pacific Ave, Suite 100. Tacoma, WA 98402. (253) 383-3084 Estimated Project Cost Range: $570,000 to $665,000 No pre-bid walkthrough is scheduled for this project. 10% MBE, 6% WBE, 5% Washington Small Business, and 5% Veterans have been established for this project. Substantially Complete-100 calendar days + Final Completion 45 calendar days Pierce College, Fort Steilacoom, Early Childhood Education Remodel, located at 9401 Farwest Drive SW, Lakewood, WA 98498 1. The Work of this Contract consists of the Work identified in the Contract Documents for Pierce College, Fort Steilacoom, Early Childhood Education Remodel (ECE). 2. Provide for the Work as shown in the Contract Documents, including all labor, materials, equipment, and services required to complete the Project. 3. Work Summary: a. Renovation and expansion of the Early Childhood Education spaces on the first floor of the Olympic South Building. b. Selective exterior demolition includes exterior wall assemblies consisting of cast concrete, storefront framing and glazing, exterior doors, site concrete and asphalt paving in whole or part as shown on the drawings. c. Selective interior demolition includes interior finishes, walls, ceilings, doors, carpet and resilient flooring, and other misc. items in whole or part as shown on drawings. d. New work includes new foundations, framed and concrete exterior walls, storefront framing and glazing, exterior and interior doors, concrete ramp and stairs including railings, interior finishes, casework and fixtures as shown on the drawings. Work Summary (Alternate Bid): a. Lighting replacement in the Playroom as noted in the documents. b. Demolition and replacement of the interior finishes in the Toilet area

Award

Educational

$438,338.00

Public - State/Provincial

Remodeling

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
27
Bidding Soon
695
All Active Projects
299
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2020

January 11, 2021

img_map_placeholder

9401 Farwest Dr SW, Tacoma, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.