Published January 14, 2021 at 7:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Sharon, Massachusetts. Completed plans call for site work for a water / sewer project.

For Massapoag Avenue Water Tank Replacement In general and without limitation the work includes, but is not limited to, the installation of a 297,900 gallon composite style, elevated, glass-fused-to-steel, water storage tank with a 56-foot tall cast-in-place, concrete pedestal; tank mixing system; demolition/removal of the existing welded steel, standpipe storage tank; site work; utilities; fencing; earthwork; associated equipment and controls; mechanical and electrical equipment; instrumentation and SCADA integration, and all necessary and incidental appurtenances to complete the installation. The Work shall consist of furnishing all labor, equipment, materials, tools, apparatus and all other incidental work required to complete the construction of the water storage tank and demolition of the existing standpipe as specified herein and shown on the Drawings. The Work shall include, but is not limited to the following: 1. Site work, including excavation, earth support, backfilling, compaction, grading, access driveway improvements including reclamation of existing pavement, rough grading, and fine grading, bituminous concrete tank apron, and utilities installation, including tank overflow piping with underground drainage infrastructure, temporary fencing, permanent fencing, tree planting, and site restoration. 2. Furnish and install of all water piping, fittings, valves, hydrants, thrust blocks, restrained joints, couplings and appurtenances as described in these Specifications, shown on the Drawings and as directed by the Engineer as required for the installation of the new water main to the water storage tank. Perform all required testing and disinfection of the water mains within the limit of work. 3. Furnish, install, disinfect and test the new composite, elevated, water storage tank including foundation, tank support structure, interior tank piping and valves, tank appurtenances, etc, as specified for the new water tank. The Contractor shall supply his own water for construction purposes.

Award

Water / Sewer

$4,034,362.00

Public - City

Site Work

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
600
Active Projects
350
Bidding Soon
4,260
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2020

February 16, 2021

Project location map

Massapoag Ave, Sharon, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.