BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

New construction, remodeling, renovation and addition to a mixed-use development in Highland, Michigan. Completed plans call for the renovation of a 47,437-square-foot educational facility; for the addition of a 6,609-square-foot educational facility; for the construction of a educational facility; and for the remodel of a educational facility.

Additions and Remodeling for: Highland Elementary School (19104), Johnson Elementary School (19105) Lakewood Elementary School (19107) and Oxbow Elementary School (19108). Lakeland High School New Concession (19113e) Lakeland High School Competition Pool Hvac (19113f) Milford High School Parking Lot Expansion (19114d) Milford High School Competition Pool Hvac (19114f) Milford High School Boulevard Upgrades (19114j) Each Bid must be accompanied by a Bid security in an amount of not less than 5% of the total base Bid sum, pledging that the Bidder will enter into a Contract with the Huron Valley Schools under the terms stated in the Bid Documents. Bid Bonds shall be issued by a bonding company meeting the requirements as described in Section 006113 Performance and Payment Bond. Bid security may also be in the form of certified check made out to the School District. The Board of Education will not consider or accept a Bid received by the Board after the Due Date for receipt of Bids. No oral, fax or emailed Bids shall be submitted. All Bidders shall provide a familial disclosure in compliance with MCL 380.1267 and attach this information to the Bid. The Bid shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the Bidder and any member of the Board of Education of the School District, or the Superintendent of the school district. The Board of Education of the School District will not consider a Bid that does not include this sworn and notarized statement. Each Bid must be accompanied by a sworn and notarized statement certifying that the Bidder is not an "Iran linked business" within the meaning of the Iran Economic Sanctions Act. TMP19104, 19105, 19107, 19108, 19113E, 19113F, 19114D, 19114F, 19114J SDA NP20006, 2020.0183, 20-1180-09 Bid Results 01A - Moving DMS - $145175 02B.1 - Building Demo Blue Star - $382000 02B.2 - Building Demo Blue Star -$281000 03A - Foundations CI Contracting - $356360 03B - Slab on Grade McCarthy -$240419 03C - Site Concrete Fessler Bowman $778000 04A.1 - Masonry Albaugh Masonry $1435000 04A.2 - Masonry Davenport $869000 05A - Structural Steel & Misc. Steel Kirby $536900 06A.1 - General Trades & Carpentry Heaney $751500 06A.2 - General Trades & Carpentry Heaney $388000 07A - Roofing Royal West Roofing & Sheet Metal $724000 07B - Metal Panels Shaffner Heaney $606722 08A - Entracnes and Storefronts, Windows, Curtain Wall, Glass and Glazing Roseville Glass $484850 09B.1 - Carpet and Resilient Flooring Shock Brothers $693850 09B.2 - Carpet and Resilient Flooring MasterCraft $427645 09C - Hard Tile DF Flooring $108667 10A - Signage Volk Corp. $31075 10B - Toilet Partitions and Accessories R.E. Leggette Compnay $42575 10C - Lockers Steel Equipment Comapny $83740 11A - Food Service Equipment Great Lakes Hotel Supply $37627 11B - Gymnasium Equipment Gardiner C Vose $37340 12A - Casework FCI Group 181000 21A - Fire Protection Absolute Fire Protection $37564 22A - Plumbing JM & Sons $833900 23A.1 - HVAC Conti $1443003 23A.2 - HVAC Conti $1455860 23A.3 - HVAC Conti $1107038 23B - Temperature Controls Control Solution $554700 26A.1 - Electrical Metro Electric $2595000 26A.2 - Electrical Great Lakes Power and Lighting $1477000 26A.3 - Electrical Munro Electric $499000 32A.1 - Site Demo, Utilities, Grading, Soil Erosion Control Lake Michigan Site Development $916900 32A.2 - Site Demo, Utilities, Grading, Soil Erosion Control Lake Michigan Site Development $496900 32B.1 - Asphalt Paving ASI $839000 32B.2 - Asphalt Paving ASI $500000 32C - Landscaping and Irrigation United Lawnscape $194255 32D - Fencing American Fence & Supply $99628

Bid Results

Educational

$22,672,193.00

Public - County

Addition, New Construction, Remodeling, Renovation

571

38

205

3

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
107
Bidding Soon
1,486
All Active Projects
628
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2020

February 8, 2021

img_map_placeholder

2390 S Milford Rd, Highland, MI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.