BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 26, 2023 at 8:00 PM

Updated January 26, 2024

Site work, new construction and renovation of an educational facility in Peshtigo, Wisconsin. Completed plans call for the construction of a educational facility; and for the renovation of a educational facility.

PACKAGE #1 The Tech Ed and Fitness Center Additions are intended to be drywall finished and ready for painting throughout on the interiors in August 2023, with all other Work fully completed. The remaining Finishes (only remaining Work) can be completed in coordination with adjacent existing campus interior renovation phases. The district is examining two possible scenarios: One option is to remodel the existing Middle/High School building, The second option is to build a completely new facility for middle and high school students. Finalized scope and project costs will be announced at a later date.

Post-Bid

Educational

$40,700,000.00

Public - City

New Construction, Renovation, Site Work

83

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
40
Bidding Soon
361
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2023

August 10, 2023

Project location map

380 Green St, Peshtigo, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.