BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a civil project in Cedarburg, Wisconsin. Completed plans call for the construction of a 1,100-square-foot water / sewer project; and for site work for a water / sewer project.

The project involves construction of a 1,100 square foot masonry/wood truss booster station building with associated mechanical, process piping, electrical, heating, ventilating, and site work. Water booster pumps and a standby engine-generator are included. The following are approximate quantities of some of the items that will be included in the bid. Final items and estimated quantities will be listed in the bid schedule: 26'x42'Booster Station Building with pumps and generator 1 LS \ 12"-15" Dia. PVC Sanitary Sewer 4,942 LF \ 48" I.D. Sanitary Manhole 19 EA \ 16" Dia. PVC Water Main 4,885 LF \ Hydrant Assembly 10 EA \ Butterfly Valve & Box 16 EA \ 30" Steel Casing 106 LF \ 36"-42" Dia RCP Storm Sewer 2,888 LF \ Storm Manhole 16 EA \ Storm Catch Basin 4 EA \ RCP End Section 4 EA \ Silt Fence 3,650 LF \ Inlet Protection 19 EA \ Rip Rap 25 TON \ 1 1/4 " Crushed Stone (Access Driveway) 974 TON \ 3" Crushed Stone (Access Driveway) 682 TON \ Slurry Backfill 300 CY \ STH 60 Traffic Control 1 LS \ This is a unit price contract. The estimated quantities as indicated above and on the Bid Schedule are inserted only for the purpose of determining the low bidder. \ The Contract letting shall be subject to the provisions of Sections 62.15, 66.0901, and 66.0903 of the Wisconsin Statutes. All bids must be submitted electronically and all bids shall be accompanied by Bid Security in the form of a Bid Bond, certified check, or cashier's check made payable to the City of Cedarburg in an amount of five (5) percent of the Bidder's maximum Bid price. If the successful bidder fails to execute the contract and furnish the required bonds within 15 days after the Award, the Bid Security shall be forfeited to the City of Cedarburg as liquidated damages. Bids shall be submitted electronically . All blanks must be filled in for the bid to be submitted and accepted. No bid may be withdrawn for a period of 45 days from the date of the bid opening. The City of Cedarburg has the right to reject any and/or all bids received, to waive any minor defects or irregularities that may be found in the bids, and to accept the bid that is in the best interest of the City. Bidder awarded a contract for the work shall be required to furnish a Performance Bond and a Payment Bond in the full amount of the contract price.

Award

Water / Sewer

$2,886,351.00

Public - City

New Construction, Site Work

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
57
Bidding Soon
903
All Active Projects
354
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2020

February 19, 2021

img_map_placeholder

To Be Determined, Cedarburg, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.