BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2020 at 7:00 PM

Updated March 26, 2024

Demolition, site work, paving and new construction of a civil project in Meade, Kansas. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Replacement of FAS S-28 existing reinforced concrete box culvert with a steel beam bridge. Off-System J-19 replace existing timber beam ridge with railroad half tanker steel culverts. Prequalification Required: Y The project consists of constructing a 30' Steel Beam Bridge and installing two Railroad Half Tanker Steel Culverts. Meade County shall provide all ofthe funds required for this project

Award

Bridges / Tunnels

$193,270.00

Public - County

Demolition, New Construction, Paving, Site Work

11

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
16
Bidding Soon
105
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2020

January 4, 2021

Project location map

Multiple Locations, Meade, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.