BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Lincoln, Illinois. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Lincoln Community High School #404 Board of Education will receive bids for the addition at the high school in Lincoln, IL 62656. A. Work to be Bid: 1. General Contractor bid to include gymnasium storage addition, new athletic building, and all associated work. 2. Mechanical Contractor bid to include installation of exhaust fans throughout existing building. B. Type of Contracts: 1. General Contractor 2. Mechanical Contractor. Bid security payable to the Owner in the amount of 5% of the total Bid, shall be executed by the Bidder in the form of certified check, bank draft, or acceptable surety. The successful bidder will be required to execute a Payment and Performance Bond. Contractor must pay all sums of money due or to become due for any labor in accordance with Illinois Prevailing Wage Act (Ill. Rev. Stat. Ch. 48, Sec. 39(s)-1-12). Wages printed in the Project Manual are for the month of bidding only. Certified Payroll is required to be submitted with all Pay Applications. Successful bidder will be required to perform criminal background checks on all workers that will be on project site. Bidding Documents may be examined at the following locations: a. Lunsford Architects, Inc., 2470 Dr. Springs Rd., Carterville, IL 62918. Office of the Superintendent, Mr. Dwight Stricklin, 1000 Railer Way, Lincoln, IL 62656. The Owner reserves the right to reject any and all bids in whole or in part or to waive any informalities in the bidding. 3. No bids shall be withdrawn for a period of Forty-Five (45) days subsequent to the opening of bids without the consent of the Owner. Bidding Schedule: The Owner requires all work in the construction documents shall commence January 4th 2021 and be completed no later than July 9th 2021. Construction of new Gymnasium Storage Addition, construction of new Concessions/Restroom Addition, construction of new Batting Cage Building, and Installation of exhaust fans throughout the existing High School Facility as described in the Construction Documents. Work to be covered by the bid shall also include all associated Mechanical, Electrical, and Plumbing work described in the Construction Documents. Bid Result: General—Gym Storage Addition Christy-Foltz $170,155 General-Athletic Building Christy-Foltz $100,435 Mechanical—Exhaust Fan A & R Mechanical Contractors $66,200

Bid Results

Educational

$336,790.00

Public - City

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
22
Bidding Soon
388
All Active Projects
166
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2020

January 4, 2021

img_map_placeholder

1000 Railer Way, Lincoln, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.