Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a water / sewer project in Broken Arrow, Oklahoma. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
The Broken Arrow Municipal Authority (BAMA) Project is a rehabilitation of the existing steel Omaha 5 Million Gallon Water Storage Tank. Specifically, the major work items include surface preparation and application of coatings to the interior and exterior of the 5 MG Tank, new 16" tank outlet and valve, miscellaneous improvements to the tank structure including new manway, new sample ports, new exterior ladder, fall protection, handrail, and site work. Equal Opportunity in Employment: All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, age or handicap. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications Sworn statement of the Bidder's assets and liabilities, technical qualifications and performance in the form of the latest annual report and financial statement are not required to be submitted with the Bidder's Proposal, but BAMA may require such statements prior to award of the construction contract. The Statement of Qualifications & Experience using the form found in Section II Proposal Documents, must be submitted with the bid and include, as a minimum, the information required herein. Failure to submit the information required in these documents may result in BAMA considering the Bid non-responsive and result in rejection of the Bid by BAMA. Bidders may be required to provide supplemental information if requested by BAMA to clarify, enhance or supplement the information provided in the Statement of Qualifications & Experience. The apparent successful Bidder shall, within two (2) days after Bid opening, submit to BAMA a list of the Subcontractors, Suppliers, individuals or entities proposed for the following portions of the Work: waterline installation and all appurtenances, excavation and grading. Such list shall be accompanied by a Statement of Qualifications & using the form found in Section II Proposal Documents, with pertinent information regarding similar projects and other evidence of qualification and experience for each such Subcontractor, Supplier, or other individual or entity. If BAMA or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, BAMA may, before the Notice of Award is given, request apparent successful Bidder to submit an acceptable substitute, within one (1) day of notification. If apparent Successful Bidder declines to make any such substitution, BAMA may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. In such event, the next lowest Bidder shall, within two (2) days after requested by BAMA, submit to BAMA the above required list of the Subcontractors, Suppliers, and other individuals or entities. In evaluating whether a Bidder is responsible, BAMA will consider the qualifications and experience of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided above. As a Proposal Guarantee, a certified check, cashier's check, bid bond or irrevocable letter of credit issued by an insured financial institution as required by law must accompany each Proposal for an amount equal to five percent (5%) of the total Bid made payable, without reserve, to BAMA. The successful Bidder must, within ten (10) days after receiving notice of award, furnish a Performance Bond, Statutory Bond and Maintenance Bond in the forms prescribed by BAMA in the amounts equal to the Contract price. The acceptance and award of this Bid will be considered by BAMA. BAMA reserves the right to reject any or all Bids. Project will be awarded to the responsible Bidder with the lowest base bid or lowest combined base and additive alternate bids, if any, which is most advantageous to BAMA. Applicable additive alternates, if any, will be determined at BAMA's discretion. The lowest responsible Bidder will be notified within ten (10) working days of the Bid opening as to when this Public Construction Contract will be placed on the BAMA Agenda for consideration.
Award
Water / Sewer
$505,500.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 15, 2020
January 14, 2021
W Omaha St, Broken Arrow, OK
Related To This Project
Broken Arrow, OK
Bid Date: Apr 19 2022
Broken Arrow, OK
Bid Date: Jul 19 2022
Broken Arrow, OK
Bid Date: Dec 14 2021
Broken Arrow, OK
Bid Date: Dec 14 2021
Broken Arrow, OK
Bid Date: Feb 01 2022
Broken Arrow, OK
Bid Date: Mar 14 2023
Broken Arrow, OK
Bid Date: Sep 27 2022
Broken Arrow, OK
Bid Date: Sep 23 2021
Broken Arrow, OK
Bid Date: Oct 20 2022
Broken Arrow, OK
Bid Date: Nov 08 2022
Broken Arrow, OK
Bid Date: Nov 08 2022
Muskogee, OK
Bid Date: Nov 16 2022
Duncan, OK
Bid Date: Jan 04 2023
Mustang, OK
Bid Date: Oct 18 2022
Muskogee, OK
Bid Date: Oct 18 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.