Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a mixed-use development in Tyndall AFB, Florida. Completed plans call for the construction of a 75,175-square-foot military facility; for site work for a military facility; 13,380-square-foot military facility; and 122,864-square-foot military facility.
Award Details Contract Award Date: Jul 12, 2022 Contract Award Number: W9127822C0012 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: XXNJCWMAKNH8 Contractor Awarded Name: B.L. Harbert International, L.L.C. Contractor Awarded Address: Birmingham, AL 35209-4564 USA Base and All Options Value (Total Contract Value): $195651603.00 This project is for the design and construction of two separate facilities: WEG HQ and WEG Maintenance Hangar and Apron Facilities. WEG HQ: The 53rd WEG HQ facility consists of one consolidated facility. The Combined Group Headquarters, 894.84 SM = 9,605 SF, Squadron Operations, 3,657 SM = 39,252SF; and an Emergency Ops Center, 2,452 SM = 26,318 SF. The combined Weapons Evaluation Group (WEG) Headquarters, constituent Squadron Operations facility and emergency Operations Center included both SCIF and SAPF areas. This multi-story facility provides a consolidated facility with administrative areas for the 53d TSS, 53d WEG, and 83d Squadron Operations staff. The administrative areas will be supported by conferencing, meeting, and other special spaces. In addition to the admin areas, the squadron operations will provide mission planning, SAPF workspace, briefing, storage, and vault space. The project includes all utilities, site improvements, special foundations, pavements, detection/protection features, security enhancements, and other supporting work. WEG Maintenance Hangar: The 53rd Weapons Evaluation Group (WEG) Hangar facility is consolidated with the WEG HQ and includes; Maintenance Hangar, 8,816 SM = 94,898 SF; Armament Research Testing, 150 SM = 1,610 SF; Aircraft Maintenance Shop, 1,434 SM = 15,434 SF; Aircraft Corrosion Control: 855 SM = 9,200 SF, and a Fuel Systems Maintenance Dock, 1,243 SM = 13,380 SF. The Aircraft Maintenance Hangar and Maintenance Shop is for the QR/F-16 and E-9 Aircraft. The QF-16 Maintenance Hangar provides space for aircraft maintenance, tool rooms, aircraft weighing and other maintenance and inspection activities. Hangars support aircraft maintenance, repair, and inspection activities that are most efficiently done under complete cover. The QF-16 Maintenance Hangar will include 12 hangar bays for the QF-16 aircraft and building support facilities. The hangar bays will have a HEF system, 10-ton crane, large fan for ventilation per 6 bays. This project will require compliance with Intelligence Community Directive (ICD) 705 for the SCIF and SAPF areas. The Armament/AGGTS/Lab is an Armament Research Testing facility attached to the Maintenance Hangar. This facility will accommodate the research, development, fabrication and testing of non-exploding, penetrating weapons made from heavy metals which are traditionally used against heavily armored targets. The Armament/AGGTS/Lab to use in conjunction with the QF-16 aircraft maintenance shop. The Aircraft Corrosion Control provides an environmentally controlled area to wash aircraft. This aircraft corrosion control facility will include a covered aircraft wash rack. The Fuel Systems Maintenance Dock is a space for an aircraft parking bay and support space for heating, plumbing, latrines, ventilation, compressed air, and fire detection and suppression. Maintenance docks provide protected space for aircraft maintenance. The fuel systems maintenance will include hangar space, administrative space, building support and fuel tank covered storage. Supporting facilities include utilities (electric service, water, sewer, gas), pavements (paving, walks, curbs and gutters), storm drainage, site improvements and building information systems. Apron Facilities: The 53 WEG Parking Apron consists of an aircraft Parking Apron, 11,447 S m = 122,864 SF. The new aircraft parking apron includes lighting. The apron includes subgrade, base and approximately 15 inches of Portland concrete cement. Additional pavement is required to support the WEG aircraft and provide area for aircraft operations outside of the obstruction free area. The apron provides aircraft parking, servicing, and loading. Apron lighting is also provided to support nighttime maintenance activities on the apron. The project includes all utilities, site improvements, soil remediation and cleanup. Privatized utility connection fees are included in their respective supporting facilities line items for electrical Gulf Coast Electric Cooperative (GCEC), water GCEC, and gas Peoples Gas Systems (PGS). The cost of this work is estimated to be between $100,000,000 and $250,000,000.00
Under Construction
Military
$195,651,603.00
Public - Federal
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 29, 2021
September 12, 2022
To Be Determined, Tyndall AFB, FL
Related To This Project
Tyndall AFB, FL
Bid Date: Sep 03 2021
Tyndall AFB, FL
Bid Date: Feb 16 2021
Tyndall AFB, FL
Bid Date: Sep 09 2022
Tyndall AFB, FL
Bid Date: Sep 19 2022
Tyndall AFB, FL
Bid Date: Oct 06 2022
Tyndall AFB, FL
Bid Date: Feb 28 2023
Tyndall AFB, FL
--
Tyndall AFB, FL
Bid Date: Aug 16 2023
Tyndall AFB, FL
Bid Date: Sep 16 2022
Tyndall AFB, FL
Bid Date: Apr 19 2021
Tyndall AFB, FL
--
Tyndall AFB, FL
Bid Date: Aug 05 2022
Tyndall AFB, FL
Bid Date: Aug 15 2022
Tyndall AFB, FL
Bid Date: Aug 19 2022
Tyndall AFB, FL
Bid Date: Aug 22 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.