Site work for a water / sewer project in Fort Thomas, Kentucky. Completed plans call for site work for a water / sewer project.

Last day for questions - January 6, 2021 at 5:00 pm EST Please email questions to Todd Solomon (tsolomon@grwinc.com) and Joan Drozd (jdrozd@grwinc.com). The proposed Work is generally described as follows: demolish existing mixer in Rapid Mix No. 2 and install new mixer; demolish existing horizontal flocculators and associated concrete columns and redwood baffles in Basins 1 & 4 and install new vertical hyperbolic flocculators, concrete columns, and fiberglass baffles; install new bridges/walkways in Basins 1 & 4 to support new flocculators and to provide access to new flocculators; demolish existing clarifier mechanisms and drives in Basins 1 & 4 and install new clarifier mechanisms and drives; remove, refurbish, and re-install existing clarifier bridges/walkways in Basins 1 & 4; demolish existing tube settlers in Basins 1,2 3 and 4 and install new inclined plate settlers; demolish existing 8-inch sludge valves and electric actuators in Basins 1 & 4 and install new 8-inch sludge valves and electric actuators; complete concrete repairs in Basins 1 & 4; demolish and replace existing sodium hypochlorite metering pump discharge piping; remove and replace damaged floor coating under sodium hypochlorite metering pump discharge pipe rack; and complete associated electrical, mechanical, and structural work, together with all related work as specified and shown on the Drawings. The Bidder awarded the contract shall complete this project within 730 calendar days. Liquidated damages will be assessed at $500 per calendar day. All Bids must be in accordance with the Instructions to Bidders and Bidding Documents on file. This project is funded with funds provided by the Kentucky Drinking Water State Revolving Fund (SRF) with federal funds provided by the Environmental Protection Agency. SRF requirements (including American Iron and Steel and Davis Bacon) and provisions must be met by the Bidder and all subcontractors. SRF requires federal prevailing wage rates to be paid to all employees of the Bidder and all employees of any subcontractor. This project is in compliance with the President's Executive Order No. 11246 (Equal Employment Opportunity) as amended. Bids will be received on a lump sum basis as described in the Contract Documents. Bid security, in the form of a certified check or a Bid Bond (insuring/bonding company shall be rated "A" by AM Best) in the amount of ten percent (10%) of the maximum total bid price, must accompany each Bid. The Successful Bidder will be required to furnish a Construction Payment Bond and a Construction Performance Bond (insuring/bonding company shall be rated "A" by AM Best) as security for the faithful performance of the contract and the payment of all bills and obligations arising from the performance of the Contract. Owner reserves the right to reject any or all Bids, including without limitation the right to reject any or all nonconforming, non-responsive, incomplete, unbalanced, or conditional Bids, to waive informalities, and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of Owner to make an award to that Bidder. Owner also reserves the right to negotiate with the apparent successful Bidder to such an extent as may be determined by Owner. MBE : 4.5% WBE : 6.9%

Award

Water / Sewer

$5,584,000.00

Public - City

Site Work

416

2

54

9

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
40
Bidding Soon
1,242
All Active Projects
480
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2021

March 15, 2021

img_map_placeholder

700 Alexandria Pike, Fort Thomas, KY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.