BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 4, 2021 at 7:00 PM

Updated February 15, 2024

Site work and renovation of a water / sewer project in New Ulm, Minnesota. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

A. 20th Street Lift Station 1. Remove four (4) existing centrifugal pumps. 2. Furnish and Install four (4) new dry pit submersible pumps. 3. Remove and replace process piping and valves. 4. Install new VFDs and electrical and controls for new pumps. 5. Other miscellaneous work as shown on the plans. B. Primary Pumps 1. Remove two (2) existing primary pumps. 2. Furnish and install (2) new rotary lobe pumps and grinders. 3. Remove and replace process piping and valves. 4. Install new electrical and controls. 5. Other miscellaneous work as shown on the plans. C. Thickened Sludge Pumps 1. Remove two (2) existing thickened sludge pumps. 2. Furnish and install (2) new rotary lobe pumps. 3. Remove and replace process piping and valves. 4. Remove existing equipment, piping and valves as noted. 5. Install new VFDs for the pumps and miscellaneous electrical and controls. 6. Other miscellaneous work as shown on the plans. D. Aeration Basin Diffuser Replacement 1. Remove and replace all membrane diffusers in the existing aeration basins. 2. Dispose of all used diffuser membranes. 3. Other miscellaneous work as shown on the plans. The work included in the project shall include the furnishing of all required labor and materials for a complete and operable electrical system as indicated on the accompanying drawings and as required by the project manual inclusive of all appurtenances not specifically shown or covered by the specifications but required for complete operation of the electrical system as defined in the documents. The work shall also include the testing, adjustment, start-up and troubleshooting of the electrical equipment and the training of the Owner's operating personnel in its operation and maintenance. It shall be the responsibility of the Contractor to furnish a complete and fully operating system. The Contractor shall be responsible for all details which may be necessary to properly install, adjust and place in operation the complete installation. The Contractor shall assume full responsibility for additional costs which may result from unauthorized deviations from the contract documents.

Award

Water / Sewer

$1,628,870.00

Public - City

Renovation, Site Work

52

1

2

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
119
Bidding Soon
1,327
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2020

January 14, 2021

Project location map

20th S St, New Ulm, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.